EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC 4.0

Stakeholder Management and Performance of Electricity Infrastructure Projects in Mombasa County, Kenya

Ali Haji Mohamed, Emmy Chelangat Rotich

International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p) · 12.07.2026 · 4 (2)

DOI: 10.61108/ijsshr.v4i2.291 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p), online erschienen am 12.07.2026. Verfasst von Ali Haji Mohamed und 1 weiteren Autor:innen. Die Arbeit nennt 70 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Electricity infrastructure projects are vital for supporting Kenya's economic growth, improving the reliability of power supply, and expanding access to affordable energy. Despite significant investments by the government through initiatives such as the Last Mile Connectivity Project and rural electrification programs, many electricity projects in Mombasa County continue to experience cost overruns, time delays, substandard quality outcomes, and low stakeholder satisfaction. Studies indicate that electricity infrastructure projects in Kenya have recorded time overruns ranging from 4.6% to 53.4% and cost overruns between 9.4% and 59%. These issues persist despite the implementation of stakeholder management practices aimed at improving project outcomes. Therefore, the main aim of this study was to examine the effect of stakeholder management on the performance of electricity infrastructure projects in Mombasa County, Kenya. Specifically, the study sought to determine the effect of stakeholder identification, stakeholder analysis, stakeholder engagement, and stakeholder monitoring on the performance of electricity infrastructure projects in the county. The study was anchored on stakeholder theory, stakeholder salience theory, systems theory, and agency theory. The research utilized an explanatory research design. The unit of analysis was 35 electricity infrastructure projects implemented in Mombasa County, comprising 26 projects (new lines and maintenance) by Kenya Power and 9 infrastructure projects by Kenya Electricity Transmission Company Limited (KETRACO). The target population consisted of 98 individuals, specifically 35 project managers and supervisors, 35 contractors, 12 engineers, and 16 staff from the Kenya Power Coast Region Infrastructure Development Department. Since the target population was small, a census approach was adopted. The study made use of both primary and secondary data. Primary data was collected using semi-structured questionnaires, while secondary data on project time and cost was obtained from KETRACO and KPLC reports. Qualitative data was analyzed using thematic analysis, with the findings presented narratively. Quantitative data was analyzed using descriptive and inferential statistics with the help of SPSS version 28. The Cronbach's Alpha values for all constructs were greater than 0.7, indicating that the questionnaire met the minimum acceptable reliability threshold. The study found that stakeholder identification, stakeholder analysis, stakeholder engagement, and stakeholder monitoring each had a positive and significant effect on the performance of electricity infrastructure projects in Mombasa County, Kenya, with the four practices jointly explaining 72.9% of the variation in project performance. The study recommends that project managers should ensure structured stakeholder listing processes are fully institutionalized so that no key stakeholders are overlooked, and that project teams should consistently apply structured processes for aligning stakeholder interests with project goals to improve performance and sustainability.

Zitieren

APA

Mohamed, A. H., & Rotich, E. C. (2026). Stakeholder Management and Performance of Electricity Infrastructure Projects in Mombasa County, Kenya. International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p), 4(2). https://doi.org/10.61108/ijsshr.v4i2.291

Vancouver

Mohamed AH, Rotich EC. Stakeholder Management and Performance of Electricity Infrastructure Projects in Mombasa County, Kenya. International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p). 2026;4(2). doi:10.61108/ijsshr.v4i2.291

BibTeX
@article{Mohamed2026,
  author = {Mohamed, Ali Haji and Rotich, Emmy Chelangat},
  title = {Stakeholder Management and Performance of Electricity Infrastructure Projects in Mombasa County, Kenya},
  journal = {International Journal of Social Science and Humanities Research (IJSSHR) ISSN 2959-7056 (o); 2959-7048 (p)},
  year = {2026},
  volume = {4},
  number = {2},
  doi = {10.61108/ijsshr.v4i2.291}
}
Kostenlos starten →