Analysis of Causes and Risk Mitigation for Delivery Delays Based on On-Time In-Full (OTIF) Data in Non-Cement Distribution Using RCA and FMEA Methods at PT XYZ

Rifki Putra Rahmadhan, Akhmad Wasiur Rizqi

International Journal of Science, Technology & Management · 14.11.2026 · 7 (6) · 757-765

DOI: 10.46729/ijstm.v7i6.1522 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Science, Technology & Management, online erschienen am 14.11.2026. Verfasst von Rifki Putra Rahmadhan und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Delivery punctuality is an important indicator of logistics service performance, yet non-cement distribution at PT XYZ still experiences delays. On Time In Full (OTIF) data from May to July 2026 recorded that only 54.64% of 14,986 shipments were delivered on time. This study aims to determine the on-time delivery rate, identify the dominant causes and root causes of delay, and determine mitigation priorities. The methods used were Pareto diagram, Root Cause Analysis (RCA) with fishbone and 5 Why, and Failure Mode and Effect Analysis (FMEA), with Severity, Occurrence, and Detection rated by two respondents. The Pareto results show that long parking time (49.9%) and unloading schedule (41.1%) caused 91.0% of the delays. RCA identified the root causes as the absence of a standard maximum stopping time, a joint arrival scheduling mechanism with receivers, a procedure for communicating estimated arrival, and a cargo readiness confirmation procedure. Based on FMEA, the highest Risk Priority Number (RPN) belongs to the absence of a joint arrival scheduling mechanism with receivers (336), followed by the absence of an estimated arrival notification procedure (168) and a standard maximum stopping time (120). Joint arrival scheduling with receivers should be the priority for improvement.

Zitieren

APA

Rahmadhan, R. P., & Rizqi, A. W. (2026). Analysis of Causes and Risk Mitigation for Delivery Delays Based on On-Time In-Full (OTIF) Data in Non-Cement Distribution Using RCA and FMEA Methods at PT XYZ. International Journal of Science, Technology & Management, 7(6), 757-765. https://doi.org/10.46729/ijstm.v7i6.1522

Vancouver

Rahmadhan RP, Rizqi AW. Analysis of Causes and Risk Mitigation for Delivery Delays Based on On-Time In-Full (OTIF) Data in Non-Cement Distribution Using RCA and FMEA Methods at PT XYZ. International Journal of Science, Technology & Management. 2026;7(6):757-765. doi:10.46729/ijstm.v7i6.1522

BibTeX
@article{Rahmadhan2026,
  author = {Rahmadhan, Rifki Putra and Rizqi, Akhmad Wasiur},
  title = {Analysis of Causes and Risk Mitigation for Delivery Delays Based on On-Time In-Full (OTIF) Data in Non-Cement Distribution Using RCA and FMEA Methods at PT XYZ},
  journal = {International Journal of Science, Technology & Management},
  year = {2026},
  volume = {7},
  number = {6},
  pages = {757--765},
  doi = {10.46729/ijstm.v7i6.1522}
}
Kostenlos starten →