EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Implementasi FMEA dan Perbaikan Tata Letak untuk Meningkatkan Produktivitas pada Departemen Dempul Painting di PT XYZ

Virna Rahmadani Ayuningtyas, Pramudi Arsiwi

Jurnal Teknik · 01.12.2025 · 23 (2) · 441-451

DOI: 10.37031/jt.v23i2.711 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Teknik, online erschienen am 01.12.2025. Verfasst von Virna Rahmadani Ayuningtyas und 1 weiteren Autor:innen. Die Arbeit nennt 15 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

PT XYZ, a bus body manufacturing company, faces a high defect rate in the Putty and Painting Department, recording a total of 3,697 defects from January to October 2023, with the peak occurring in April at 521 cases (14.1%). The dominant defects include discoloration, overspray, waviness, and damage to the clear coat and putty, indicating a systemic issue. This study aims to identify major defects and determine improvement priorities using the Operation Process Chart, 8 Waste questionnaire, and Failure Mode and Effect Analysis (FMEA) based on the Risk Priority Number (RPN). Results show that the basecoat process has the highest RPN value of 80, while the baggage paint process has the lowest at 12. The main causes include overproduction, long workstation distances, excessive waiting time, unstable raw materials, lack of operator training, and weak inspection systems. Recommended improvements include SOP standardization, layout optimization, regular training, temperature and lighting control, and strengthening quality control to enhance product quality and production efficiency.

Zitieren

APA

Ayuningtyas, V. R., & Arsiwi, P. (2025). Implementasi FMEA dan Perbaikan Tata Letak untuk Meningkatkan Produktivitas pada Departemen Dempul Painting di PT XYZ. Jurnal Teknik, 23(2), 441-451. https://doi.org/10.37031/jt.v23i2.711

Vancouver

Ayuningtyas VR, Arsiwi P. Implementasi FMEA dan Perbaikan Tata Letak untuk Meningkatkan Produktivitas pada Departemen Dempul Painting di PT XYZ. Jurnal Teknik. 2025;23(2):441-451. doi:10.37031/jt.v23i2.711

BibTeX
@article{Ayuningtyas2025,
  author = {Ayuningtyas, Virna Rahmadani and Arsiwi, Pramudi},
  title = {Implementasi FMEA dan Perbaikan Tata Letak untuk Meningkatkan Produktivitas pada Departemen Dempul Painting di PT XYZ},
  journal = {Jurnal Teknik},
  year = {2025},
  volume = {23},
  number = {2},
  pages = {441--451},
  doi = {10.37031/jt.v23i2.711}
}
Kostenlos starten →