EUVIMEDEUVIMED entdecken
Crossref

Risk Analysis for the Alfamart Warehouse Construction Project in Palangkaraya, Central Kalimantan

Adam Khair, Aqli Mursadin

International Journal of Innovative Science and Research Technology · 17.11.2026 · 11 (11) · 479

DOI: 10.38124/ijisrt/26nov294 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Innovative Science and Research Technology, online erschienen am 17.11.2026. Verfasst von Adam Khair und 1 weiteren Autor:innen. Die Arbeit nennt 22 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The operational success and completion performance of a logistics warehouse construction project heavily depend on precise schedule adherence and rigorous budget control. In field execution, however, contractors frequently encounter unpredictable environmental factors that lead to severe schedule overruns and cost inflations. These challenges become particularly acute in large-scale facilities featuring wide-span structural steel framing erected over challenging peat soil geotechnics.

Zitieren

APA

Khair, A., & Mursadin, A. (2026). Risk Analysis for the Alfamart Warehouse Construction Project in Palangkaraya, Central Kalimantan. International Journal of Innovative Science and Research Technology, 11(11), 479. https://doi.org/10.38124/ijisrt/26nov294

Vancouver

Khair A, Mursadin A. Risk Analysis for the Alfamart Warehouse Construction Project in Palangkaraya, Central Kalimantan. International Journal of Innovative Science and Research Technology. 2026;11(11):479. doi:10.38124/ijisrt/26nov294

BibTeX
@article{Khair2026,
  author = {Khair, Adam and Mursadin, Aqli},
  title = {Risk Analysis for the Alfamart Warehouse Construction Project in Palangkaraya, Central Kalimantan},
  journal = {International Journal of Innovative Science and Research Technology},
  year = {2026},
  volume = {11},
  number = {11},
  pages = {479},
  doi = {10.38124/ijisrt/26nov294}
}
Kostenlos starten →