Risk Management Analysis in the Implementation of High-Rise Building Construction Projects in Banjarmasin City, South Kalimantan
International Journal of Innovative Science and Research Technology · 17.03.2026 · 1062
DOI: 10.38124/ijisrt/26mar620 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Innovative Science and Research Technology, online erschienen am 17.03.2026. Verfasst von Fahrizal Saputra und 2 weiteren Autor:innen. Die Arbeit nennt 14 Literaturangaben.
Abstract (Originalsprache)
High-rise building projects in swampy areas, such as in Banjarmasin City, South Kalimantan, face various technical and non-technical risks that can hinder project implementation, particularly those related to cost and time efficiency. This study aims to identify key risk factors that emerge during the implementation phase and formulate mitigation strategies suited to local project characteristics. This research method uses a quantitative approach with purposive sampling through the distribution of structured questionnaires and semi-structured interviews with stakeholders, including contractors, consultants, and PBG officials. Data analysis was conducted using a severity index and a probability-impact matrix to determine risk levels and prioritize their management. The study findings indicate eight significant risk factors, such as material damage or loss, weather delays, and logistical inefficiencies. Recommended mitigation strategies include improving material security, scheduling work according to weather conditions, and more organized material management. This research contributes to construction risk management practices, particularly for high-rise building projects in areas with unstable geographical conditions.
Zitieren
APA
Saputra, F., Prasetia, I., & Yuliana, C. (2026). Risk Management Analysis in the Implementation of High-Rise Building Construction Projects in Banjarmasin City, South Kalimantan. International Journal of Innovative Science and Research Technology, 1062. https://doi.org/10.38124/ijisrt/26mar620
Vancouver
Saputra F, Prasetia I, Yuliana C. Risk Management Analysis in the Implementation of High-Rise Building Construction Projects in Banjarmasin City, South Kalimantan. International Journal of Innovative Science and Research Technology. 2026:1062. doi:10.38124/ijisrt/26mar620
BibTeX
@article{Saputra2026,
author = {Saputra, Fahrizal and Prasetia, Irfan and Yuliana, Candra},
title = {Risk Management Analysis in the Implementation of High-Rise Building Construction Projects in Banjarmasin City, South Kalimantan},
journal = {International Journal of Innovative Science and Research Technology},
year = {2026},
pages = {1062},
doi = {10.38124/ijisrt/26mar620}
}
EUVIMED