Crossref
Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)
Anbar Journal of Engineering Sciences · 2008
DOI: 10.37649/aengs.2007.14260 ↗Kurz gefasst
Fachartikel in der Zeitschrift Anbar Journal of Engineering Sciences, 2008. Verfasst von Khmis N. Sayle und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Sayle, K. N., & Janabi, I. A. A. (2008). Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). Anbar Journal of Engineering Sciences. https://doi.org/10.37649/aengs.2007.14260
Vancouver
Sayle KN, Janabi IAA. Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). Anbar Journal of Engineering Sciences. 2008. doi:10.37649/aengs.2007.14260
BibTeX
@article{Sayle2008,
author = {Sayle, Khmis N. and Janabi, Ibrahim A. Al-},
title = {Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)},
journal = {Anbar Journal of Engineering Sciences},
year = {2008},
doi = {10.37649/aengs.2007.14260}
}
EUVIMED