Analisis Penjadwalan Perbaikan Gas Turbine Part dengan Metode PERT dan Gantt Chart pada Industri MRO
Industrika : Jurnal Ilmiah Teknik Industri · 2026-04-28 · 10 (2) · 425-434
DOI: 10.37090/2ddcce59 ↗At a glance
Journal article in Industrika : Jurnal Ilmiah Teknik Industri, published online on 2026-04-28. Written by Leonard Yopandi Rajagukguk and 3 co-authors. The full text is freely available (open access, CC BY-SA 4.0).
Abstract (original language)
Delays in the implementation of repair projects can significantly impact a company’s reputation and operational continuity. One of the main causes of such delays is the absence of effective project activity scheduling, which leads to untimely completion of tasks. Therefore, this study was conducted to minimize delays in the gas turbine repair process. By applying the Program Evaluation and Review Technique (PERT) and Gantt Chart methods to improve scheduling efficiency, this study aims not only to enhance the effectiveness of repair scheduling but also to forecast the achievable repair capacity within a one-year period, with a specific focus on the Transition Piece component. The findings indicate that the repair duration can be accelerated by 9%, and the repair capacity that can be achieved within one year is 22.22%. Keywords: Gantt Chart, PERT, Project Management, Scheduling
Cite
APA
Rajagukguk, L. Y., Winarsih, N., Rahma, R. A., & Arrafi, M. N. (2026). Analisis Penjadwalan Perbaikan Gas Turbine Part dengan Metode PERT dan Gantt Chart pada Industri MRO. Industrika : Jurnal Ilmiah Teknik Industri, 10(2), 425-434. https://doi.org/10.37090/2ddcce59
Vancouver
Rajagukguk LY, Winarsih N, Rahma RA, Arrafi MN. Analisis Penjadwalan Perbaikan Gas Turbine Part dengan Metode PERT dan Gantt Chart pada Industri MRO. Industrika : Jurnal Ilmiah Teknik Industri. 2026;10(2):425-434. doi:10.37090/2ddcce59
BibTeX
@article{Rajagukguk2026,
author = {Rajagukguk, Leonard Yopandi and Winarsih, Neneng and Rahma, Rana Ardila and Arrafi, Muhammad Naufal},
title = {Analisis Penjadwalan Perbaikan Gas Turbine Part dengan Metode PERT dan Gantt Chart pada Industri MRO},
journal = {Industrika : Jurnal Ilmiah Teknik Industri},
year = {2026},
volume = {10},
number = {2},
pages = {425--434},
doi = {10.37090/2ddcce59}
}
EUVIMED