A Time and Cost Analysis to Pier Construction Project in Tuban by Earned Value Analysis Method
Journal of Architecture and Civil Engineering · 2024
DOI: 10.35629/8193-09083849 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Architecture and Civil Engineering, 2024. Verfasst von Meidijas Yoedianto und 2 weiteren Autor:innen.
Abstract (Originalsprache)
The development of a project must be attentive to certain aspects of cost, quality and the implementation time. Planning and control need to be carried out to increase the likelihood of success in a project. The condition of the pier construction project in Tuban as the research object in this study is experiencing delay, so this research is intended to provide the cost and time analysis results as approached with a method of Earned Value Analysis (EVA). A project status can be identified early and in more accurate way with EVA, so this method can be used as a basis for improving the project condition by calculating three indicators; Planned Value (PV), Earned Value (EV) and Actual Cost (AC). These indicators were used in the analysis of this research. The research procedure was carried out by collecting, summarizing and analyzing data. The required data is the cost budget plan, time schedule, weekly project progress report and weekly actual costs, and by processing these data, the planning value (PV), result value (EV), and actual value (AC) will be produced. Result of the research analysis were in the form of Cost Performance Index or CPI value where until the 29th week revealing a value below 1 (1) meaning there is a cost underrun in this project which in the 49th week has CPI value of 1.11. Meanwhile, for the time performance index or SPI, until the 19th week has a value of above 1 (>1) meaning there is an acceleration progress in this project, while at the 20th to 49th weeks the SPI value is below 1 (
Zitieren
APA
Yoedianto, M., Hidayat, S., & Winanda, L. A. R. (2024). A Time and Cost Analysis to Pier Construction Project in Tuban by Earned Value Analysis Method. Journal of Architecture and Civil Engineering. https://doi.org/10.35629/8193-09083849
Vancouver
Yoedianto M, Hidayat S, Winanda LAR. A Time and Cost Analysis to Pier Construction Project in Tuban by Earned Value Analysis Method. Journal of Architecture and Civil Engineering. 2024. doi:10.35629/8193-09083849
BibTeX
@article{Yoedianto2024,
author = {Yoedianto, Meidijas and Hidayat, Sutanto and Winanda, Lila Ayu Ratna},
title = {A Time and Cost Analysis to Pier Construction Project in Tuban by Earned Value Analysis Method},
journal = {Journal of Architecture and Civil Engineering},
year = {2024},
doi = {10.35629/8193-09083849}
}
EUVIMED