EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Sustainable Quality Control Decisions in Water Conservancy Supply Chains: A Principal-Agent Approach Considering Early Completion Benefits

Tianyu Fan, Zhongbing Gao, Xuefeng Pang, Yizhou Li, Zihan Wang, Ying Guo, Zhiyong Li

Sustainability · 16.07.2026 · 18 (14) · 7279

DOI: 10.3390/su18147279 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 16.07.2026. Verfasst von Tianyu Fan und 6 weiteren Autor:innen. Die Arbeit nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Digitalization and Intelligentization-Driven Collaborative Governance in the Wen’anwa Flood Storage, Training Programme for Young Backbone Teachers of Higher Education Institutions in Henan Province, High-level Talent Research Start-up Project of North China University of Water Resources and Electric Power.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Water conservancy infrastructure is essential for sustainable socio-economic development, but quality failures caused by information asymmetry among stakeholders may undermine long-term project performance. Existing studies rarely integrate early completion benefits into quality control decisions or investigate governance strategies under different information conditions. This study develops a three-level principal-agent model involving the owner, supervisor, and contractor by incorporating early completion incentives into the quality supervision framework. The optimal quality monitoring level (Pa), quality guarantee deposit (S), and penalty mechanism (F) are derived under symmetric, asymmetric, and incomplete information scenarios, where probability density functions are introduced to characterize behavioral uncertainty under incomplete information. The results show that early completion incentives require a balance between schedule acceleration and quality risk control. Under sufficient contractor quality probability-based behavior, increased time effort reduces the owner’s supervision demand, whereas schedule compression combined with weak quality control increases the need for financial constraints. Under asymmetric and incomplete information, higher penalties and adaptive deposit strategies are required to mitigate moral hazard. Moreover, contractor probability-based behavior and supervisor performance exhibit substitution effects on owner supervision, indicating that strong partner probability-based behavior can reduce monitoring costs. These findings provide practical guidance for designing adaptive contracts, including differentiated supervision strategies and probability-based behavior-based deposit mechanisms, thereby enhancing the resilience and sustainability of water infrastructure supply chains.

Förderung

  • Digitalization and Intelligentization-Driven Collaborative Governance in the Wen’anwa Flood Storage
  • Training Programme for Young Backbone Teachers of Higher Education Institutions in Henan Province
  • High-level Talent Research Start-up Project of North China University of Water Resources and Electric Power
  • Natural Science Youth Fund Project of Henan Province

Zitieren

APA

Fan, T., Gao, Z., Pang, X., Li, Y., Wang, Z., Guo, Y., & Li, Z. (2026). Sustainable Quality Control Decisions in Water Conservancy Supply Chains: A Principal-Agent Approach Considering Early Completion Benefits. Sustainability, 18(14), 7279. https://doi.org/10.3390/su18147279

Vancouver

Fan T, Gao Z, Pang X, Li Y, Wang Z, Guo Y, et al. Sustainable Quality Control Decisions in Water Conservancy Supply Chains: A Principal-Agent Approach Considering Early Completion Benefits. Sustainability. 2026;18(14):7279. doi:10.3390/su18147279

BibTeX
@article{Fan2026,
  author = {Fan, Tianyu and Gao, Zhongbing and Pang, Xuefeng and Li, Yizhou and Wang, Zihan and Guo, Ying and Li, Zhiyong},
  title = {Sustainable Quality Control Decisions in Water Conservancy Supply Chains: A Principal-Agent Approach Considering Early Completion Benefits},
  journal = {Sustainability},
  year = {2026},
  volume = {18},
  number = {14},
  pages = {7279},
  doi = {10.3390/su18147279}
}
Kostenlos starten →