Coal Pillar Width Determination and Roof Full-Cable Support Technology for Gob-Side Entry Driving in Extra-Thick Coal Seams

Yu Kang, Baisheng Zhang, Dong Duan, Shuaiyou Ji, Zhechong Liang, Longbo Du

Processes · 18.05.2026 · 14 (10) · 1628

DOI: 10.3390/pr14101628 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Processes, online erschienen am 18.05.2026. Verfasst von Yu Kang und 5 weiteren Autor:innen. Die Arbeit nennt 26 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, Fundamental Research Program of Shanxi Province.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

To determine a reasonable coal pillar width for gob-side entry driving in extra-thick coal seams and improve roof control under thick top-coal conditions, the No. 50604 return airway of Ti’an Coal Mine was selected as the engineering case. A combined approach involving theoretical calculation, numerical simulation, and field monitoring was adopted. Based on limit equilibrium theory and a modified Kastner formula for rectangular roadways, the reasonable coal pillar width was determined to be 7.13~8.42 m. Sensitivity analysis showed that the calculated width was sensitive to the stress concentration and lateral pressure coefficients. FLAC3D simulations compared the plastic zone and deformation of the gob-side entry under different pillar widths, and 8 m was determined as the reasonable width. Mining-stage simulations indicated that the plastic failure range and deformation increased markedly within 5~10 m ahead of the working face. A roof full-cable deep–shallow collaborative support system was proposed, and reasonable roof support parameters were determined through orthogonal numerical simulation and multi-index evaluation. Field monitoring showed that roadway deformation remained controllable during excavation and mining, verifying the rationality of the 8 m narrow pillar and roof full-cable support parameters.

Förderung

  • National Natural Science Foundation of China
  • Fundamental Research Program of Shanxi Province

Zitieren

APA

Kang, Y., Zhang, B., Duan, D., Ji, S., Liang, Z., & Du, L. (2026). Coal Pillar Width Determination and Roof Full-Cable Support Technology for Gob-Side Entry Driving in Extra-Thick Coal Seams. Processes, 14(10), 1628. https://doi.org/10.3390/pr14101628

Vancouver

Kang Y, Zhang B, Duan D, Ji S, Liang Z, Du L. Coal Pillar Width Determination and Roof Full-Cable Support Technology for Gob-Side Entry Driving in Extra-Thick Coal Seams. Processes. 2026;14(10):1628. doi:10.3390/pr14101628

BibTeX
@article{Kang2026,
  author = {Kang, Yu and Zhang, Baisheng and Duan, Dong and Ji, Shuaiyou and Liang, Zhechong and Du, Longbo},
  title = {Coal Pillar Width Determination and Roof Full-Cable Support Technology for Gob-Side Entry Driving in Extra-Thick Coal Seams},
  journal = {Processes},
  year = {2026},
  volume = {14},
  number = {10},
  pages = {1628},
  doi = {10.3390/pr14101628}
}
Kostenlos starten →