EUVIMEDDescubrir EUVIMED
Open access · CC BY 4.0

Research on Comprehensive Evaluation Model of Virtual Power Plant Operational Benefits Based on DEMATEL-CRITIC-EDAS

Ranran Li, Hecheng Yuan, Jianing Zhang, Qiushuang Li, Jiarui Li, Wanying Li, Zhengsen Ji

Processes · 2026-05-11 · 14 (10) · 1545

DOI: 10.3390/pr14101545 ↗

At a glance

Journal article in Processes, published online on 2026-05-11. Written by Ranran Li and 6 co-authors. Cited 1 times so far (Crossref); 27 references. The full text is freely available (open access, CC BY 4.0). Funded by: State Grid Shandong Electric Power Company.

ResumenDatos bibliográficosCiteRelated studies

Abstract (original language)

Different types of Virtual Power Plants (VPPs) play distinct roles within power systems. To scientifically evaluate the operational benefits of VPPs, this paper constructs a comprehensive evaluation framework based on combined weighting and the Evaluation based on Distance from Average Solution (EDAS) method. First, an evaluation index system is established encompassing four dimensions: economic, environmental, social, and technical. Subsequently, a hybrid model integrating DEMATEL, CRITIC, Game Theory, and EDAS is proposed. Specifically, the DEMATEL method is employed to analyze the causal relationships among indicators and determine subjective weights, while the CRITIC method is used to calculate objective weights. Game Theory is then applied to optimize the combination of weights, and the EDAS method is utilized to rank the alternatives. Empirical analysis of five VPP scenarios indicates that the renewable energy accommodation rate and hardware investment costs are the core driving factors affecting operational benefits. Specifically, the renewable-energy accommodation rate exhibits the highest combined weight of 0.08, and the hardware investment cost reaches 0.07. Among the scenarios, a wind-solar-storage hybrid VPP demonstrates the optimal comprehensive performance. The results are consistent with comparative methods such as TOPSIS, verifying the reliability of the proposed framework and providing a scientific reference for VPP investment decision-making.

Funding

  • State Grid Shandong Electric Power Company

Cite

APA

Li, R., Yuan, H., Zhang, J., Li, Q., Li, J., Li, W., & Ji, Z. (2026). Research on Comprehensive Evaluation Model of Virtual Power Plant Operational Benefits Based on DEMATEL-CRITIC-EDAS. Processes, 14(10), 1545. https://doi.org/10.3390/pr14101545

Vancouver

Li R, Yuan H, Zhang J, Li Q, Li J, Li W, et al. Research on Comprehensive Evaluation Model of Virtual Power Plant Operational Benefits Based on DEMATEL-CRITIC-EDAS. Processes. 2026;14(10):1545. doi:10.3390/pr14101545

BibTeX
@article{Li2026,
  author = {Li, Ranran and Yuan, Hecheng and Zhang, Jianing and Li, Qiushuang and Li, Jiarui and Li, Wanying and Ji, Zhengsen},
  title = {Research on Comprehensive Evaluation Model of Virtual Power Plant Operational Benefits Based on DEMATEL-CRITIC-EDAS},
  journal = {Processes},
  year = {2026},
  volume = {14},
  number = {10},
  pages = {1545},
  doi = {10.3390/pr14101545}
}
Start for free →