EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria

Osama A. I. Hussain, Robert C. Moehler, Stuart D. C. Walsh, Dominic D. Ahiaga-Dagbui

Infrastructures · 14.05.2026 · 11 (5) · 173

DOI: 10.3390/infrastructures11050173 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Infrastructures, online erschienen am 14.05.2026. Verfasst von Osama A. I. Hussain und 3 weiteren Autor:innen. Die Arbeit nennt 83 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Monash University.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study evaluates the adoption and efficacy of the 5th Dimension Building Information Modelling (5D-BIM) as a cost dimension for mega rail projects, extending the discussion beyond just technological implementation to consider broader policy and practical implications. The purpose of this article is to understand the governance context of 5D-BIM implementation for rail and transport projects and evaluate the effectiveness of the 5D-BIM framework as currently applied by conducting semi-structured interviews with key stakeholders. Drawing on semi-structured interviews with 22 stakeholders across government, industry, and technology providers, the research examines current 5D-BIM practices. While the primary focus of the research is 5D BIM implementations within the state of Victoria, Australia, which is currently experiencing a surge in rail projects, interviews were also conducted with additional stakeholders from international rail projects for context. The findings reveal fragmented adoption, varying levels of organisational maturity, and significant policy and implementation gaps, particularly in the role of government as the primary client of transport infrastructure. The results of the interviews emphasise the centrality of government and regulatory context in driving the adoption and implementation of 5D-BIM as the primary client of transportation infrastructure and identify actionable recommendations for policymakers and practitioners towards a more integrated approach to 5D-BIM in mega rail projects. While 5D-BIM demonstrates clear benefits in enhancing cost estimation, coordination, and decision-making, its effectiveness is constrained by the absence of clear standards, limited BIM literacy, and inconsistent regulatory guidance. This study provides one of the first empirical validations of the 5D-BIM governance framework, demonstrating that its success is driven less by technological capability and more by policy alignment, standardisation, and institutional leadership.

Förderung

  • Monash University

Zitieren

APA

Hussain, O. A. I., Moehler, R. C., Walsh, S. D. C., & Ahiaga-Dagbui, D. D. (2026). Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria. Infrastructures, 11(5), 173. https://doi.org/10.3390/infrastructures11050173

Vancouver

Hussain OAI, Moehler RC, Walsh SDC, Ahiaga-Dagbui DD. Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria. Infrastructures. 2026;11(5):173. doi:10.3390/infrastructures11050173

BibTeX
@article{Hussain2026,
  author = {Hussain, Osama A. I. and Moehler, Robert C. and Walsh, Stuart D. C. and Ahiaga-Dagbui, Dominic D.},
  title = {Minimizing Cost Overrun in Rail Projects Through 5D-Bim: The Case Study of Victoria},
  journal = {Infrastructures},
  year = {2026},
  volume = {11},
  number = {5},
  pages = {173},
  doi = {10.3390/infrastructures11050173}
}
Kostenlos starten →