EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Cost Impact Comparative Analysis via BIM between Heritage Regular Maintenance Projects and Long-Term Restoration Projects—A Case Study

Doaa Tahoon, Ayman El-Zohairy, Hesham Ibrahim Hendawy

Heritage · 20.12.2023 · 7 (1) · 50-75

DOI: 10.3390/heritage7010002 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Heritage, online erschienen am 20.12.2023. Verfasst von Doaa Tahoon und 2 weiteren Autor:innen. Die Arbeit wurde bisher 11-mal zitiert (Crossref) und nennt 25 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The financial implications of long-term restoration projects for cultural heritage, as compared to regular maintenance efforts, often underscore a flawed decision-making process. This can result from years of neglect versus consistent, organized maintenance. Striking a balance between these strategies is paramount for preserving cultural legacies. This research aims to evaluate the trade-offs between the initial expenditures of restoration initiatives and the consistent costs of maintenance activities. We leverage Building Information Modelling (BIM) and its specialized application for heritage preservation, known as Heritage Building Information Modelling (HBIM). This offers a digital depiction of the heritage building’s conservation state and associated intervention costs. Specifically, this study taps into the fifth dimension of BIM, cost estimation, to draw a comparative analysis between the financial ramifications of regular maintenance and long-term restoration projects. This assessment is exemplified through a case study on the “Aidkeen Al-Bendqdari Dome” located in historic Cairo, Egypt—a component of the Prince Taz Palace. The analysis integrates cost data to generate insights. The ultimate goal is to devise a comparative framework that can guide authorities in budgetary decisions and resource distribution.

Zitieren

APA

Tahoon, D., El-Zohairy, A., & Hendawy, H. I. (2023). Cost Impact Comparative Analysis via BIM between Heritage Regular Maintenance Projects and Long-Term Restoration Projects—A Case Study. Heritage, 7(1), 50-75. https://doi.org/10.3390/heritage7010002

Vancouver

Tahoon D, El-Zohairy A, Hendawy HI. Cost Impact Comparative Analysis via BIM between Heritage Regular Maintenance Projects and Long-Term Restoration Projects—A Case Study. Heritage. 2023;7(1):50-75. doi:10.3390/heritage7010002

BibTeX
@article{Tahoon2023,
  author = {Tahoon, Doaa and El-Zohairy, Ayman and Hendawy, Hesham Ibrahim},
  title = {Cost Impact Comparative Analysis via BIM between Heritage Regular Maintenance Projects and Long-Term Restoration Projects—A Case Study},
  journal = {Heritage},
  year = {2023},
  volume = {7},
  number = {1},
  pages = {50--75},
  doi = {10.3390/heritage7010002}
}
Kostenlos starten →