A Novel Multi-Timescale Optimal Scheduling Model for a Power–Gas Mutual Transformation Virtual Power Plant with Power-to-Gas Conversion and Comprehensive Demand Response
Energies · 02.08.2024 · 17 (15) · 3805
DOI: 10.3390/en17153805 ↗Kurz gefasst
Fachartikel in der Zeitschrift Energies, online erschienen am 02.08.2024. Verfasst von Shuo Yin und 5 weiteren Autor:innen. Die Arbeit wurde bisher 10-mal zitiert (Crossref) und nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: State Grid Henan Electric Power Company Science and Technology Program.
Abstract (Originalsprache)
To optimize energy structure and efficiently utilize renewable energy sources, it is necessary to establish a new electrical power–gas mutual transformation virtual power plant that has low-carbon benefits. To promote the economic and low-carbon operation of a virtual power plant and reduce uncertainty regarding the use of new energy, a multi-timescale (day-ahead to intraday) optimal scheduling model is proposed. First, a basic model of a new interconnected power–gas virtual power plant (power-to-gas demand response virtual power plant, PD-VPP) was established with P2G and comprehensive demand response as the main body. Second, in response to the high volatility of new energy, a day-ahead to intraday multi-timescale collaborative operation optimization model is proposed. In the day-ahead optimization period, the next day’s internal electricity price is formulated, and the price-based demand response load is regulated in advance so as to ensure profit maximization for the virtual power plant. Based on the results of day-ahead modeling, intraday optimization was performed on the output of each distributed unit, considering the cost of the carbon emission reductions to achieve low-carbon economic dispatch with minimal operating costs. Finally, several operation scenarios are established for a simulation case analysis. The validity of the proposed model was verified via comparison.
Förderung
- State Grid Henan Electric Power Company Science and Technology Program
Zitieren
APA
Yin, S., He, Y., Li, Z., Li, S., Wang, P., & Chen, Z. (2024). A Novel Multi-Timescale Optimal Scheduling Model for a Power–Gas Mutual Transformation Virtual Power Plant with Power-to-Gas Conversion and Comprehensive Demand Response. Energies, 17(15), 3805. https://doi.org/10.3390/en17153805
Vancouver
Yin S, He Y, Li Z, Li S, Wang P, Chen Z. A Novel Multi-Timescale Optimal Scheduling Model for a Power–Gas Mutual Transformation Virtual Power Plant with Power-to-Gas Conversion and Comprehensive Demand Response. Energies. 2024;17(15):3805. doi:10.3390/en17153805
BibTeX
@article{Yin2024,
author = {Yin, Shuo and He, Yang and Li, Zhiheng and Li, Senmao and Wang, Peng and Chen, Ziyi},
title = {A Novel Multi-Timescale Optimal Scheduling Model for a Power–Gas Mutual Transformation Virtual Power Plant with Power-to-Gas Conversion and Comprehensive Demand Response},
journal = {Energies},
year = {2024},
volume = {17},
number = {15},
pages = {3805},
doi = {10.3390/en17153805}
}
EUVIMED