EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Recycling Marble Waste from Afghan Mining Sites as a Replacement for Cement and Sand

Mohammad Rafi Rafi, Safiullah Omary, Amanullah Faqiri, Elhem Ghorbel

Buildings · 08.01.2025 · 15 (2) · 164

DOI: 10.3390/buildings15020164 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 08.01.2025. Verfasst von Mohammad Rafi Rafi und 3 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 47 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The marble industry in Afghanistan generates significant waste due to a lack of skilled labor and advanced machinery, which is often discarded in landfills. Previous studies suggest that marble waste can be utilized in construction, particularly in cement-based structures. This research investigates using marble waste in concrete as a replacement for cement and sand to address environmental concerns and promote sustainability. A comparative study replaced marble waste with a calcareous filler from Omya SAS. The marble waste, collected from a mining site in Nangarhar, Afghanistan, consisted of 29% particles smaller than 63 μm and 71% sand particles. The waste marble (WM) was added to concrete as a replacement for cement and sand at 3.5%, 4%, and 4.5% by volume. Limestone filler (LF) replaced only cement in the concrete mix. The reference concrete mix aimed for a C25/30 strength. The results showed slight improvements in concrete workability with increasing waste marble content. The optimal WM dosage was 4%, which led to a 9% reduction in compressive strength and a 7% drop in splitting tensile strength. However, this dosage reduced concrete density, improving transfer properties and resulting in cheaper, lighter concrete. The 4% WM dosage corresponds to 7.5% cement and 12% sand replacement.

Zitieren

APA

Rafi, M. R., Omary, S., Faqiri, A., & Ghorbel, E. (2025). Recycling Marble Waste from Afghan Mining Sites as a Replacement for Cement and Sand. Buildings, 15(2), 164. https://doi.org/10.3390/buildings15020164

Vancouver

Rafi MR, Omary S, Faqiri A, Ghorbel E. Recycling Marble Waste from Afghan Mining Sites as a Replacement for Cement and Sand. Buildings. 2025;15(2):164. doi:10.3390/buildings15020164

BibTeX
@article{Rafi2025,
  author = {Rafi, Mohammad Rafi and Omary, Safiullah and Faqiri, Amanullah and Ghorbel, Elhem},
  title = {Recycling Marble Waste from Afghan Mining Sites as a Replacement for Cement and Sand},
  journal = {Buildings},
  year = {2025},
  volume = {15},
  number = {2},
  pages = {164},
  doi = {10.3390/buildings15020164}
}
Kostenlos starten →