EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Experimental and Numerical Investigation into Full-Scale Model of New Type Assembled Integral Utility Tunnel

Jichao Zhang, Yan Zhang, Chaoheng Peng, Youkun Lei, Aijun Zhang, Zhengxuan Zuo, Zeyu Chen

Buildings · 31.05.2023 · 13 (6) · 1428

DOI: 10.3390/buildings13061428 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Buildings, online erschienen am 31.05.2023. Verfasst von Jichao Zhang und 6 weiteren Autor:innen. Die Arbeit wurde bisher 9-mal zitiert (Crossref) und nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Guangdong Key Areas R&D Program Projects, China, Research Project of Guangdong Power Grid Co..

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This article summarizes the current construction methods of prefabricated utility tunnels. (1) The proposed cast-in-place utility tunnel project was used as a background for this study. (2) The original cast-in-place structure was divided into components, and the connection methods of prefabricated composite slabs and mortise and tenon joints were used to propose a new type of prefabricated concrete utility tunnel construction method. After completing the design of the new prefabricated utility tunnel, a numerical simulation analysis of the actual stress situation of the utility tunnel was carried out using ABAQUS finite element software to verify the overall structural performance of the assembled utility tunnel. In addition, after completing the construction of the full-size model of the dual chamber, static load tests were carried out. (3) The test used the method of monotonic static bidirectional loading with a central hydraulic jack and tensioned steel strands, analyzed the cracks, deformation curves, and stress-strain of steel bars and concrete of the overall structure of the utility tunnel, and (4) verified the feasibility of the new assembled integral utility tunnel.

Förderung

  • Guangdong Key Areas R&D Program Projects, China
  • Research Project of Guangdong Power Grid Co.

Zitieren

APA

Zhang, J., Zhang, Y., Peng, C., Lei, Y., Zhang, A., Zuo, Z., & Chen, Z. (2023). Experimental and Numerical Investigation into Full-Scale Model of New Type Assembled Integral Utility Tunnel. Buildings, 13(6), 1428. https://doi.org/10.3390/buildings13061428

Vancouver

Zhang J, Zhang Y, Peng C, Lei Y, Zhang A, Zuo Z, et al. Experimental and Numerical Investigation into Full-Scale Model of New Type Assembled Integral Utility Tunnel. Buildings. 2023;13(6):1428. doi:10.3390/buildings13061428

BibTeX
@article{Zhang2023,
  author = {Zhang, Jichao and Zhang, Yan and Peng, Chaoheng and Lei, Youkun and Zhang, Aijun and Zuo, Zhengxuan and Chen, Zeyu},
  title = {Experimental and Numerical Investigation into Full-Scale Model of New Type Assembled Integral Utility Tunnel},
  journal = {Buildings},
  year = {2023},
  volume = {13},
  number = {6},
  pages = {1428},
  doi = {10.3390/buildings13061428}
}
Kostenlos starten →