An Integrated Engineering Feasibility-Screening Framework for Electrification and Climate-Sensitive Retrofit of Existing Office Buildings

Darren Kelly, Akhtar Kalam, Shasha Wang

Applied Sciences · 15.11.2026 · 16 (22) · 11323

DOI: 10.3390/app162211323 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 15.11.2026. Verfasst von Darren Kelly und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Decarbonising existing office buildings requires retrofit pathways compatible with inherited electrical, hydronic, terminal-unit and spatial constraints. This study develops and applies a staged engineering feasibility-screening framework to two Canberra office buildings, integrating demand reduction, energy recovery, thermal storage, heat-pump electrification, electrical-demand assessment, annual energy and emissions, hydronic compatibility, spatial feasibility and future-weather sensitivity. At an electricity emissions factor of 0.500 kgCO2-e/kWh, air-source heat-pump (ASHP)/polyvalent electrification eliminated on-site gas combustion, changing annual operational emissions by −1.4% in Building A and +0.5% in Building B. Deterministic winter ASHP plant demands were 956.66 and 658.75 kW, respectively, requiring building-level electrical-capacity verification. Ground-source heat pumps reduced winter electrical demand but were excluded within the assessed site boundaries under the adopted borefield assumptions. At 55/45 °C, air-handling-unit heating-coil capacity fell to 71–79% and 71–75% of scheduled duty, respectively. Under a shared hourly weather-response screen, annual heating demand decreased by 24.2% and cooling demand increased by 30.6% in both buildings; identical proportional changes reflect common modelling assumptions. The framework identifies retrofit pathways that may proceed, require enabling works or further evidence, or be excluded before detailed design.

Zitieren

APA

Kelly, D., Kalam, A., & Wang, S. (2026). An Integrated Engineering Feasibility-Screening Framework for Electrification and Climate-Sensitive Retrofit of Existing Office Buildings. Applied Sciences, 16(22), 11323. https://doi.org/10.3390/app162211323

Vancouver

Kelly D, Kalam A, Wang S. An Integrated Engineering Feasibility-Screening Framework for Electrification and Climate-Sensitive Retrofit of Existing Office Buildings. Applied Sciences. 2026;16(22):11323. doi:10.3390/app162211323

BibTeX
@article{Kelly2026,
  author = {Kelly, Darren and Kalam, Akhtar and Wang, Shasha},
  title = {An Integrated Engineering Feasibility-Screening Framework for Electrification and Climate-Sensitive Retrofit of Existing Office Buildings},
  journal = {Applied Sciences},
  year = {2026},
  volume = {16},
  number = {22},
  pages = {11323},
  doi = {10.3390/app162211323}
}
Kostenlos starten →