Dynamic Risk Transmission in Public–Private Partnership Projects: A Causality-Informed Network Framework
Applied Sciences · 05.03.2026 · 16 (5) · 2507
DOI: 10.3390/app16052507 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 05.03.2026. Verfasst von Heqing Li und 2 weiteren Autor:innen. Die Arbeit nennt 50 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Research on Supply Chain Optimization Strategy.
Abstract (Originalsprache)
Interdependent factors in complex engineering systems propagate and amplify through directed influence networks rather than evolving independently. This study proposes a causality-informed dynamic transmission framework and applies it to risk propagation in Public–Private Partnership (PPP) infrastructure projects. Directed inter-factor influences are quantified using the Decision-Making Trial and Evaluation Laboratory (DEMATEL) method to construct a directed influence structure. Each factor’s endogenous evolution is modeled by a logistic trajectory (slow accumulation–rapid escalation–gradual saturation), while an external-transfer component separates internal dynamics from transmission-induced increments. A five-dimension, 21-factor PPP risk system is developed from the literature and failure cases. Here, “causality-informed” denotes expert-elicited directional assumptions, not formal counterfactual causal identification. The results show that transfer-driven increments concentrate mainly in technical/engineering and economic dimensions, whereas political/legal risks exhibit smaller increments; such increments are most evident for preparation-related and all-stage factors and cluster around the rapid-rise interval. We further propose the Risk Transmission Initiation Index (RTII) to identify likely upstream initiators with cascade-triggering potential, enabling prevention-oriented risk control in coupled engineering systems.
Förderung
- Research on Supply Chain Optimization Strategy
Zitieren
APA
Li, H., Gao, Y., & Lai, K. K. (2026). Dynamic Risk Transmission in Public–Private Partnership Projects: A Causality-Informed Network Framework. Applied Sciences, 16(5), 2507. https://doi.org/10.3390/app16052507
Vancouver
Li H, Gao Y, Lai KK. Dynamic Risk Transmission in Public–Private Partnership Projects: A Causality-Informed Network Framework. Applied Sciences. 2026;16(5):2507. doi:10.3390/app16052507
BibTeX
@article{Li2026,
author = {Li, Heqing and Gao, Yuan and Lai, Kin Keung},
title = {Dynamic Risk Transmission in Public–Private Partnership Projects: A Causality-Informed Network Framework},
journal = {Applied Sciences},
year = {2026},
volume = {16},
number = {5},
pages = {2507},
doi = {10.3390/app16052507}
}
EUVIMED