Methodological Approaches to Risk Management in Public-private Partnership Projects in Construction
Management and Entrepreneurship in Ukraine: the stages of formation and problems of development · 29.06.2026 · 8 (1) · 148
DOI: 10.23939/smeu2026.01.148 ↗Kurz gefasst
Fachartikel in der Zeitschrift Management and Entrepreneurship in Ukraine: the stages of formation and problems of development, online erschienen am 29.06.2026. Verfasst von V. Lych und 1 weiteren Autor:innen. Die Arbeit nennt 12 Literaturangaben.
Abstract (Originalsprache)
The article generalizes methodological approaches to risk management in public-private partnership (PPP) construction projects from the standpoint of public investment economics, contract governance, and life-cycle cost management. The relevance of the topic is driven by large-scale reconstruction and infrastructure modernization needs combined with limited fiscal capacity, capital market constraints, and heightened uncertainty, which together increase the requirements for bankability, budget affordability, institutional reliability, and transparent allocation of responsibilities between the parties. The study argues that risks in construction PPPs should be treated as an integrated life-cycle-based system linking institutional roles, contract architecture, financing structure, payment mechanisms, service obligations, and performance indicators. Particular attention is paid to the consistency between the risk matrix, the financial model, and the payment regime: demand-risk transfer in user-pay schemes requires robust tariff assumptions, demand forecasting, and regulatory predictability, whereas availability-payment models shift the focus toward measurable KPIs, verification procedures, compliance with service standards, and long-term fiscal discipline. Based on a synthesis of Ukrainian academic literature and regulatory requirements, the paper proposes a consolidated classification of key risk groups, including pre-project, design, construction, financial, operational, regulatory, market, and force majeure risks, complemented by a controllability perspective that supports rational allocation between public and private parties. The article substantiates a consistent mitigation logic integrating risk registers, qualitative and quantitative assessment, selection of management form (avoidance, reduction, transfer, acceptance), contractual safeguards such as guarantees, insurance, and quality warranties, independent technical expertise, formalized change- management rules, and continuous monitoring supported by reporting, audit, and verification procedures. The practical contribution lies in providing methodological guidance for structuring, financing, contracting, and supervising construction PPPs, as well as for standardizing risk- management approaches within portfolios of inter-municipal infrastructure projects implemented under long-term partnership arrangements.
Zitieren
APA
Lych, V., & Artemenko, A. (2026). Methodological Approaches to Risk Management in Public-private Partnership Projects in Construction. Management and Entrepreneurship in Ukraine: the stages of formation and problems of development, 8(1), 148. https://doi.org/10.23939/smeu2026.01.148
Vancouver
Lych V, Artemenko A. Methodological Approaches to Risk Management in Public-private Partnership Projects in Construction. Management and Entrepreneurship in Ukraine: the stages of formation and problems of development. 2026;8(1):148. doi:10.23939/smeu2026.01.148
BibTeX
@article{Lych2026,
author = {Lych, V. and Artemenko, A.},
title = {Methodological Approaches to Risk Management in Public-private Partnership Projects in Construction},
journal = {Management and Entrepreneurship in Ukraine: the stages of formation and problems of development},
year = {2026},
volume = {8},
number = {1},
pages = {148},
doi = {10.23939/smeu2026.01.148}
}
EUVIMED