Analysis of Influence of Cut-and-Cover Method on Retaining Structures and Differential Settlement in Subway Foundation Pit Construction
Applied Sciences · 04.07.2025 · 15 (13) · 7520
DOI: 10.3390/app15137520 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Sciences, online erschienen am 04.07.2025. Verfasst von Yi Liu und 6 weiteren Autor:innen. Die Arbeit wurde bisher 6-mal zitiert (Crossref) und nennt 28 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
This study established a numerical model for a foundation pit at the Zhongyilu Station of the Wuhan Metro Line 12, using Plaxis3D version 2021 finite element software to examine the horizontal displacement of the diaphragm wall, ground surface settlement, and differential settlement between the diaphragm wall and the lattice columns across various construction stages. A comparison with the cut-and-cover method prompted the adoption of a strategy that integrates segmental pouring of the main structure and the installation of internal supports to optimize the original scheme. The results indicated that as the foundation pit was excavated, both the horizontal displacement of diaphragm wall and the ground surface settlement gradually increased, while the differential settlement between the diaphragm wall and the lattice columns shows exhibited an initial decrease followed by an increase. In comparison to the cut-and-cover method, the cover-and-cut method demonstrated greater efficacy in controlling foundation pit deformation and minimizing disturbances to surrounding environment. As the number of segmental pouring layers and support levels increased, the overall deformation of the foundation pit showed a gradual decreasing trend, and the differential settlement between the diaphragm wall and the lattice columns continued to fluctuate. When each floor slab was poured in three layers with two supports placed in the middle, the maximum horizontal displacement of the diaphragm wall could be reduced by 22.47%, and the maximum ground surface settlement could be decreased by 19.01%. The findings in this research can provide valuable basis and reference for the design and construction of similar projects.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Liu, Y., Huang, L., Tang, X., Xue, Y., Ke, W., Luo, Y., & Guan, L. (2025). Analysis of Influence of Cut-and-Cover Method on Retaining Structures and Differential Settlement in Subway Foundation Pit Construction. Applied Sciences, 15(13), 7520. https://doi.org/10.3390/app15137520
Vancouver
Liu Y, Huang L, Tang X, Xue Y, Ke W, Luo Y, et al. Analysis of Influence of Cut-and-Cover Method on Retaining Structures and Differential Settlement in Subway Foundation Pit Construction. Applied Sciences. 2025;15(13):7520. doi:10.3390/app15137520
BibTeX
@article{Liu2025,
author = {Liu, Yi and Huang, Lei and Tang, Xiaolin and Xue, Yanbin and Ke, Wenbin and Luo, Yang and Guan, Lingxiao},
title = {Analysis of Influence of Cut-and-Cover Method on Retaining Structures and Differential Settlement in Subway Foundation Pit Construction},
journal = {Applied Sciences},
year = {2025},
volume = {15},
number = {13},
pages = {7520},
doi = {10.3390/app15137520}
}