Investigation of Surface Settlement Caused by Subway Construction in Xuzhou, China with the InSAR Method
Soil Mechanics and Foundation Engineering · 2026-05 · 63 (2) · 196-204
DOI: 10.1007/s11204-026-10129-0 ↗Kurz gefasst
Fachartikel in der Zeitschrift Soil Mechanics and Foundation Engineering, online erschienen am 07.07.2026. Verfasst von R. N. Zhao und 3 weiteren Autor:innen. Die Arbeit nennt 13 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Zhao, R. N., Chen, C., Li, J. F., & Meng, H. (2026). Investigation of Surface Settlement Caused by Subway Construction in Xuzhou, China with the InSAR Method. Soil Mechanics and Foundation Engineering, 63(2), 196-204. https://doi.org/10.1007/s11204-026-10129-0
Vancouver
Zhao RN, Chen C, Li JF, Meng H. Investigation of Surface Settlement Caused by Subway Construction in Xuzhou, China with the InSAR Method. Soil Mechanics and Foundation Engineering. 2026;63(2):196-204. doi:10.1007/s11204-026-10129-0
BibTeX
@article{Zhao2026,
author = {Zhao, R. N. and Chen, C. and Li, J. F. and Meng, H.},
title = {Investigation of Surface Settlement Caused by Subway Construction in Xuzhou, China with the InSAR Method},
journal = {Soil Mechanics and Foundation Engineering},
year = {2026},
volume = {63},
number = {2},
pages = {196--204},
doi = {10.1007/s11204-026-10129-0}
}
EUVIMED