Construction works of the Tisza bridge in the M44 expressway section between Lakitelek-Tiszakürt

István Lakatos, Zoltán Kispéter

Concrete Structures · 2022

DOI: 10.32970/cs.2022.1.1 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Concrete Structures, 2022. Verfasst von István Lakatos und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Work commenced in the first half of 2019 on the newest section of the M 44, connecting Nagykőrös to Békéscsaba, between Lakitelek and Tiszakürt. A new 556-metre-long Tisza bridge was built here by A-Híd Zrt., based on the plans of Uvaterv Co. (professional designer), with a maximum span of 152 metres. The project is implemented by National Infrastructure Development Ltd., the main contractor was Duna Aszfalt Ltd. The traffic started on the superstructure in December 2021 (Fig. 1).

Zitieren

APA

Lakatos, I., & Kispéter, Z. (2022). Construction works of the Tisza bridge in the M44 expressway section between Lakitelek-Tiszakürt. Concrete Structures. https://doi.org/10.32970/cs.2022.1.1

Vancouver

Lakatos I, Kispéter Z. Construction works of the Tisza bridge in the M44 expressway section between Lakitelek-Tiszakürt. Concrete Structures. 2022. doi:10.32970/cs.2022.1.1

BibTeX
@article{Lakatos2022,
  author = {Lakatos, István and Kispéter, Zoltán},
  title = {Construction works of the Tisza bridge in the M44 expressway section between Lakitelek-Tiszakürt},
  journal = {Concrete Structures},
  year = {2022},
  doi = {10.32970/cs.2022.1.1}
}
Kostenlos starten →