EUVIMEDEUVIMED entdecken
Crossref

Planning and Construction of The New Gänstor Bridge

Bastian Sweers, Thomas Klähne, Anna Tutko, Henry Ripke, Timo Roth

ce/papers · 2026-09 · 9 (2-3) · 1084-1089

DOI: 10.1002/cepa.70741 ↗

Kurz gefasst

Fachartikel in der Zeitschrift ce/papers, online erschienen am 14.09.2026. Verfasst von Bastian Sweers und 4 weiteren Autor:innen. Die Arbeit nennt 5 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The new Gänstor Bridge is a single‐span integral composite frame structure over the Danube that will replace the old bridge designed by U. Finsterwalder. With a span of 86.50 m, it is one of the longest frame structures in Germany. It connects the cities of Ulm and Neu‐Ulm and will be able to accommodate not only car, bicycle and pedestrian traffic, but also trams. The design is the result of a design competition announced in 2019/2020. Drawing inspiration from the old prestressed concrete bridge, which is an outstanding example of engineering from the early 1950s, the design impresses with its slim appearance. This slenderness is achieved, among other things, by the tapering of the superstructure from the frame corner to the middle of the bridge and by the cross‐sectional height decreasing from the middle of the roadway to the outer edge. The bridge consists of two substructures. Each consists of a 5‐cell hollow box made of steel and a 25 cm thick reinforced concrete slab. The superstructure is clamped into the deep‐founded abutments. The construction of the new structure is very demanding due to the inner‐city and environmental constraints. For sustainability reasons, the existing pillar foundations of a previous structure from 1912 will be used to assemble the new superstructure.

Zitieren

APA

Sweers, B., Klähne, T., Tutko, A., Ripke, H., & Roth, T. (2026). Planning and Construction of The New Gänstor Bridge. ce/papers, 9(2-3), 1084-1089. https://doi.org/10.1002/cepa.70741

Vancouver

Sweers B, Klähne T, Tutko A, Ripke H, Roth T. Planning and Construction of The New Gänstor Bridge. ce/papers. 2026;9(2-3):1084-1089. doi:10.1002/cepa.70741

BibTeX
@article{Sweers2026,
  author = {Sweers, Bastian and Klähne, Thomas and Tutko, Anna and Ripke, Henry and Roth, Timo},
  title = {Planning and Construction of The New Gänstor Bridge},
  journal = {ce/papers},
  year = {2026},
  volume = {9},
  number = {2-3},
  pages = {1084--1089},
  doi = {10.1002/cepa.70741}
}
Kostenlos starten →