EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

A Statistical Method to Evaluate the Significant Factors That Causes Schedule Delays in Indian Construction Industry

Gend Lal Chakrawarti, Ravindra Kumar Raj

International Journal of Scientific Research in Civil Engineering · 29.01.2023 · 7 (1) · 72-87

DOI: 10.32628/ijsrce22716 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Scientific Research in Civil Engineering, online erschienen am 29.01.2023. Verfasst von Gend Lal Chakrawarti und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Objective

The timed up and go (TUG) test is method used to determine the functional mobility of persons with stroke. Its reliability, validity, reaction rate, fall prediction, and psychological characteristics concerning ambulation ability have been validated. However, the relationship between TUG performance and community ambulation ability is unclear. The purpose of this study was to investigate whether the TUG performance time could indicate community ambulation levels differentially in persons with chronic stroke.

Design

Cross sectional study. Material and methods: Total 27 subjects (both male and female) who were previously diagnosed by a neurologist as suffering with chronic stroke were included as per inclusion and exclusion criteria and informed consent was obtained from all the subjects after the procedure was explained to them. All the subjects were assigned to one group only. Subjects were recruited from different hospitals, physiotherapy centres and communities in and around Allahabad and Dehradun.

Result

The data was analyzed for 27 participants and the mean age was 58.70 ± 6.75 years and mean of duration of stroke was 26.48 ± 12.73 months. our study showed highly significant correlation between four square step test and timed up & go test (r = .983,p

Zitieren

APA

Chakrawarti, G. L., & Raj, R. K. (2023). A Statistical Method to Evaluate the Significant Factors That Causes Schedule Delays in Indian Construction Industry. International Journal of Scientific Research in Civil Engineering, 7(1), 72-87. https://doi.org/10.32628/ijsrce22716

Vancouver

Chakrawarti GL, Raj RK. A Statistical Method to Evaluate the Significant Factors That Causes Schedule Delays in Indian Construction Industry. International Journal of Scientific Research in Civil Engineering. 2023;7(1):72-87. doi:10.32628/ijsrce22716

BibTeX
@article{Chakrawarti2023,
  author = {Chakrawarti, Gend Lal and Raj, Ravindra Kumar},
  title = {A Statistical Method to Evaluate the Significant Factors That Causes Schedule Delays in Indian Construction Industry},
  journal = {International Journal of Scientific Research in Civil Engineering},
  year = {2023},
  volume = {7},
  number = {1},
  pages = {72--87},
  doi = {10.32628/ijsrce22716}
}
Kostenlos starten →