EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Investigation of Project Delays: Towards a Sustainable Construction Industry

Aftab Hameed Memon, Abdul Qadir Memon, Shabir Hussain Khahro, Yasir Javed

Sustainability · 12.01.2023 · 15 (2) · 1457

DOI: 10.3390/su15021457 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Sustainability, online erschienen am 12.01.2023. Verfasst von Aftab Hameed Memon und 3 weiteren Autor:innen. Die Arbeit wurde bisher 37-mal zitiert (Crossref) und nennt 94 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The construction industry is one of the key industries for any country. It has been observed that this industry is suffering from sustainable solutions during project execution. It is evident from the literature that most of the construction projects are seriously affected by delays. Pakistan’s construction industry also suffers similar challenges. After the COVID-19 pandemic, the construction industry is experiencing several challenges which have resulted in project delays. Thus, this study investigates the key challenges affecting the timely completion of construction projects. The challenges were discovered from the literature and investigated to analyze their significance towards a sustainable construction project. This study also observes the relationships between the key challenges using Partial Least Squares Structural Equation Modeling (PLS-SEM). A structural model was developed based on the 55 common challenges identified from literature. Data collection was administered through a structured questionnaire survey using a 5-point Likert-scale. The challenges were grouped into six constructs. The outcome reported 20 critical challenges, with information and communication-related factors being the most important challenge in the construction industry. Contract management also significantly affects project time overrun. The created model served as a starting point for academics, researchers, and practitioners to create an effective system for regulating time overrun challenges.

Zitieren

APA

Memon, A. H., Memon, A. Q., Khahro, S. H., & Javed, Y. (2023). Investigation of Project Delays: Towards a Sustainable Construction Industry. Sustainability, 15(2), 1457. https://doi.org/10.3390/su15021457

Vancouver

Memon AH, Memon AQ, Khahro SH, Javed Y. Investigation of Project Delays: Towards a Sustainable Construction Industry. Sustainability. 2023;15(2):1457. doi:10.3390/su15021457

BibTeX
@article{Memon2023,
  author = {Memon, Aftab Hameed and Memon, Abdul Qadir and Khahro, Shabir Hussain and Javed, Yasir},
  title = {Investigation of Project Delays: Towards a Sustainable Construction Industry},
  journal = {Sustainability},
  year = {2023},
  volume = {15},
  number = {2},
  pages = {1457},
  doi = {10.3390/su15021457}
}
Kostenlos starten →