Abstract (Originalsprache)
Indonesia holds among the world's largest bauxite reserves, yet for decades most of this resource was exported as low value-added raw ore, generating limited economic benefit for the country. The government's mineral downstreaming policy, culminating in a nationwide ban on raw bauxite exports since June 2023, has created an urgent need for domestic alumina refining capacity, while the very large capital requirements and volatile raw-material prices involved make such investment decisions highly uncertain. This study assesses the investment feasibility of constructing an alumina refinery plant with a production capacity of 2 million tons per year in the Mempawah Industrial Area, West Kalimantan, Indonesia, driven by this policy context and by growing global demand for aluminum-based products. A quantitative approach was used, comprising demand forecasting with the Moving Average method (m = 3), estimation of capital expenditure (CAPEX) and operating expenditure (OPEX), and evaluation of financial feasibility through Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP), followed by a scenario-based sensitivity analysis on bauxite and caustic soda (NaOH) prices. The demand forecast indicates a stable long-term national alumina consumption of approximately 5.17 million tons per year, supporting the plant's 2-million-ton-per-year capacity. Results show a required investment of approximately IDR 22.44 trillion, dominated by production machinery and equipment (44%). The financial evaluation yields a positive NPV of approximately IDR 3.49 trillion, an IRR of 12.93% (above the 10% Minimum Attractive Rate of Return), and a payback period of 7 years and 306 days, indicating that the project is financially feasible. Sensitivity analysis reveals that bauxite price is the most influential variable, followed by caustic soda price; the project remains feasible as long as IRR stays above the MARR and NPV remains positive. Compared with earlier alumina/SGA plant studies, which addressed either technical process design or financial feasibility in isolation, this study integrates both dimensions with a raw-material price-sensitivity analysis, offering a more complete decision-making basis for large-scale alumina refinery investment in Indonesia.
Zitieren
APA
Sugiantoro, W., Oetomo, D. S., & Hermawan, A. (2026). Feasibility Study for the Construction of a 2 Million TPYAlumina Refinery Plant in Mempawah Industrial Area, West Kalimantan. Heuristic, 213-224. https://doi.org/10.30996/heuristic.v23i2.133822
Vancouver
Sugiantoro W, Oetomo DS, Hermawan A. Feasibility Study for the Construction of a 2 Million TPYAlumina Refinery Plant in Mempawah Industrial Area, West Kalimantan. Heuristic. 2026:213-224. doi:10.30996/heuristic.v23i2.133822
BibTeX
@article{Sugiantoro2026,
author = {Sugiantoro, Wahyu and Oetomo, Dedy Setyo and Hermawan, Asep},
title = {Feasibility Study for the Construction of a 2 Million TPYAlumina Refinery Plant in Mempawah Industrial Area, West Kalimantan},
journal = {Heuristic},
year = {2026},
pages = {213--224},
doi = {10.30996/heuristic.v23i2.133822}
}
EUVIMED