Technical and Financial Feasibility Study of A 10 MW Waste-Power Plant Construction Project
Advances: Jurnal Ekonomi & Bisnis · 06.05.2026 · 4 (2) · 379-391
DOI: 10.60079/ajeb.v4i2.762 ↗Kurz gefasst
Fachartikel in der Zeitschrift Advances: Jurnal Ekonomi & Bisnis, online erschienen am 06.05.2026. Verfasst von Swempri Agung Prasetyo. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Purpose
This study evaluates the technical and financial feasibility of developing a 10 MW Waste-to-Energy Power Plant (PLTSa) in Tembilahan City as an integrated response to urban waste management problems and increasing electricity demand. Research Method: A quantitative techno-economic feasibility approach was employed. Waste generation was measured in accordance with SNI 19-3964-1994, yielding 0.376 kg/person/day. Energy potential was analyzed using an assumed Lower Heating Value of 3,674 kcal/kg under three technology scenarios: pyrolysis, incineration with combined heat and power, and gasification. Financial feasibility was assessed using Net Present Value, Benefit-Cost Ratio, Internal Rate of Return, and Payback Period at a 10% discount rate. Results and Discussion: Gasification demonstrated the highest feasibility, with an NPV of IDR 83.03 billion, a B/C ratio of 1.86, an IRR of 15%, and a payback period of 12.8 years. Pyrolysis and incineration were less feasible due to lower conversion efficiency. However, project viability remains sensitive to assumptions about waste calorific value and cost.
Implications
WTE planning should consider local waste characteristics, technology-specific costs, and operational risks to support realistic policy decisions. Originality: This study provides a context-specific techno-economic assessment of PLTSa development in a non-metropolitan city in Indonesia.
Zitieren
APA
Prasetyo, S. A. (2026). Technical and Financial Feasibility Study of A 10 MW Waste-Power Plant Construction Project. Advances: Jurnal Ekonomi & Bisnis, 4(2), 379-391. https://doi.org/10.60079/ajeb.v4i2.762
Vancouver
Prasetyo SA. Technical and Financial Feasibility Study of A 10 MW Waste-Power Plant Construction Project. Advances: Jurnal Ekonomi & Bisnis. 2026;4(2):379-391. doi:10.60079/ajeb.v4i2.762
BibTeX
@article{Prasetyo2026,
author = {Prasetyo, Swempri Agung},
title = {Technical and Financial Feasibility Study of A 10 MW Waste-Power Plant Construction Project},
journal = {Advances: Jurnal Ekonomi & Bisnis},
year = {2026},
volume = {4},
number = {2},
pages = {379--391},
doi = {10.60079/ajeb.v4i2.762}
}
EUVIMED