Identifikasi Delay Factor Proyek Pembangunan Amphitheater Siger Park Melalui Analisis Deviasi Kurva-S
Jurnal Ilmiah Rekayasa Sipil · 22.10.2026 · 23 (2) · 226-235
DOI: 10.30630/jirs.v23i2.55 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Ilmiah Rekayasa Sipil, online erschienen am 22.10.2026. Verfasst von Gatra Gautama und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The construction project for the Siger Park Amphitheater within the Bakauheni Harbour City area was planned with an execution period of 90 calendar days (13 weeks). During implementation, the project schedule was revised twice via Addendum I and Addendum II. This study aims to identify the factors causing project delays using the S-Curve deviation analysis method, which compares planned versus actual cumulative progress weights at each contract stage. Data were analyzed from contract documents, weekly planned-versus-actual S-Curves (weeks 1 through 24), and the Mutual Check 100% (MC-100) recapitulation. Analysis results indicate that under the initial contract (weeks 1 through 9), actual progress reached only 7.69% against a planned target of 51.83%, resulting in a deviation of -44.14%; this served as the basis for issuing Addendum I, which revised the duration to 16 weeks. During the Addendum I period, deviations ranged from -16.26% to -33.69% up to week 15, prompting the issuance of Addendum II, which extended the total duration to 24 weeks (168 days), an increase of 77 days (84.6%) over the initial contract duration. The most significant shifts in work value occurred in the Amphitheater construction (an 82.0% increase, from IDR 6,151.0 million to IDR 11,192.8 million) and the complete elimination of the control room work (valued at IDR 825.4 million) after the contract had commenced, indicating that changes in scope and design were the dominant factors causing the delays. Furthermore, field observations confirmed several factors contributing to operational delays: outstanding rock-breaking work from the previous contractor, limited access due to a single work road, heavy rainfall coinciding and delays in the procurement of specialized wood-plastic composite (WPC) decking materials. The study recommends strengthening the review of designs and work volumes prior to contract signing to mitigate the risk of delays in similar projects.
Zitieren
APA
Gautama, G., & Mauliana, Y. (2026). Identifikasi Delay Factor Proyek Pembangunan Amphitheater Siger Park Melalui Analisis Deviasi Kurva-S. Jurnal Ilmiah Rekayasa Sipil, 23(2), 226-235. https://doi.org/10.30630/jirs.v23i2.55
Vancouver
Gautama G, Mauliana Y. Identifikasi Delay Factor Proyek Pembangunan Amphitheater Siger Park Melalui Analisis Deviasi Kurva-S. Jurnal Ilmiah Rekayasa Sipil. 2026;23(2):226-235. doi:10.30630/jirs.v23i2.55
BibTeX
@article{Gautama2026,
author = {Gautama, Gatra and Mauliana, Yunita},
title = {Identifikasi Delay Factor Proyek Pembangunan Amphitheater Siger Park Melalui Analisis Deviasi Kurva-S},
journal = {Jurnal Ilmiah Rekayasa Sipil},
year = {2026},
volume = {23},
number = {2},
pages = {226--235},
doi = {10.30630/jirs.v23i2.55}
}
EUVIMED