Cost and Time Performance Analysis Using the Earned Value Method in the MCC (Motor Control Center) Warehouse Room Construction Project at Pt. Omya Plant Paciran Lamongan

Aris Lukmanul Khakim, Budi Witjaksana, Jaka Purnama

Formosa Journal of Science and Technology · 02.07.2026 · 5 (6) · 1439-1454

DOI: 10.55927/fjst.v5i6.76 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Formosa Journal of Science and Technology, online erschienen am 02.07.2026. Verfasst von Aris Lukmanul Khakim und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Planned Value (PV) represents the expected expenses for tasks designated for a particular timeframe and outlined in the financial plan, also referred to as the Budgeted Cost of Work Scheduled (BCWS). This figure is calculated by taking the proportion of intended progress as per the timeline and multiplying it by the expenses earmarked for the project as detailed in the Bill of Quantities (RAB). PV or BCWS = (percentage of planned progress) x (Budget) PV or BCWS calculation for Week 1. PV or BCWS = (percentage of plan) x (total budget for the project) PV or BCWS = (0. 07%) x (Rp. 2,270,000,000). PV or BCWS = Rp. 1,589,000. Earned Value (EV) or BCWP reflects the budgeted costs associated with work that has been finished, calculated by multiplying the percentage of actual progress by the budget. EV or BCWP = (percentage of actual progress) x (Budget) EV or BCWP calculation for Week 1. EV or BCWP = (percentage of actual progress) x (total budget for the project) EV or BCWP = (0. 07%) x (Rp. 2,270,000,000). EV or BCWP = Rp. 1,589,000. According to the assessment conducted, the project duration was completed 7 days ahead of the projected timeline of 133 days. The assessment indicated that the final expenses were below the contracted amount of Rp. 2,189,355,000, resulting in cost efficiency

Zitieren

APA

Khakim, A. L., Witjaksana, B., & Purnama, J. (2026). Cost and Time Performance Analysis Using the Earned Value Method in the MCC (Motor Control Center) Warehouse Room Construction Project at Pt. Omya Plant Paciran Lamongan. Formosa Journal of Science and Technology, 5(6), 1439-1454. https://doi.org/10.55927/fjst.v5i6.76

Vancouver

Khakim AL, Witjaksana B, Purnama J. Cost and Time Performance Analysis Using the Earned Value Method in the MCC (Motor Control Center) Warehouse Room Construction Project at Pt. Omya Plant Paciran Lamongan. Formosa Journal of Science and Technology. 2026;5(6):1439-1454. doi:10.55927/fjst.v5i6.76

BibTeX
@article{Khakim2026,
  author = {Khakim, Aris Lukmanul and Witjaksana, Budi and Purnama, Jaka},
  title = {Cost and Time Performance Analysis Using the Earned Value Method in the MCC (Motor Control Center) Warehouse Room Construction Project at Pt. Omya Plant Paciran Lamongan},
  journal = {Formosa Journal of Science and Technology},
  year = {2026},
  volume = {5},
  number = {6},
  pages = {1439--1454},
  doi = {10.55927/fjst.v5i6.76}
}
Kostenlos starten →