ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG AGRARIA DAN TATA RUANG BADAN PERTANAHAN BOJONEGORO TAHAP II

Annisa’ Carina, Anggitsna Mujib Rabbani, Fitria Maya Lestari, Nor Ahmad Fahrurroziqin, Khozin Gilang Ramadhan, Agung Kristiawan

Jurnal Teknik Sipil Giratory UPGRIS · 30.06.2026 · 7 (1) · 40-50

DOI: 10.26877/giratory.v7i1.28131 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Teknik Sipil Giratory UPGRIS, online erschienen am 30.06.2026. Verfasst von Annisa’ Carina und 5 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction project delays are a common problem in Indonesia, often resulting in increased costs, decreased quality, and disruption to project completion schedules. This study aims to analyze the factors causing delays in the Bojonegoro Land Agency's Agrarian and Spatial Planning Building Phase II project. The Critical Path Method (CPM) was used, which identifies the critical path within the project and activities that could potentially cause delays. Data were collected through documentation, field observations, and interviews with project stakeholders. The results indicate that delays occurred due to several internal factors, such as inexperienced workers, delays in the provision of materials and equipment, and ineffective coordination. The project's critical path consists of a series of activities with no time leeway (float) with a total duration of 108 days. By understanding the activities on the critical path, project managers can take mitigating measures to prevent further delays. This study contributes to construction project time management and serves as a reference for future similar research.

Zitieren

APA

Carina, A., Rabbani, A. M., Lestari, F. M., Fahrurroziqin, N. A., Ramadhan, K. G., & Kristiawan, A. (2026). ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG AGRARIA DAN TATA RUANG BADAN PERTANAHAN BOJONEGORO TAHAP II. Jurnal Teknik Sipil Giratory UPGRIS, 7(1), 40-50. https://doi.org/10.26877/giratory.v7i1.28131

Vancouver

Carina A, Rabbani AM, Lestari FM, Fahrurroziqin NA, Ramadhan KG, Kristiawan A. ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG AGRARIA DAN TATA RUANG BADAN PERTANAHAN BOJONEGORO TAHAP II. Jurnal Teknik Sipil Giratory UPGRIS. 2026;7(1):40-50. doi:10.26877/giratory.v7i1.28131

BibTeX
@article{Carina2026,
  author = {Carina, Annisa’ and Rabbani, Anggitsna Mujib and Lestari, Fitria Maya and Fahrurroziqin, Nor Ahmad and Ramadhan, Khozin Gilang and Kristiawan, Agung},
  title = {ANALISIS FAKTOR KETERLAMBATAN PROYEK PEMBANGUNAN GEDUNG AGRARIA DAN TATA RUANG BADAN PERTANAHAN BOJONEGORO TAHAP II},
  journal = {Jurnal Teknik Sipil Giratory UPGRIS},
  year = {2026},
  volume = {7},
  number = {1},
  pages = {40--50},
  doi = {10.26877/giratory.v7i1.28131}
}