EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Monitoring and control technologies for the full-process construction of a long-span cable-stayed bridge

Zhentian Yang, Xiaotang Wang, Wanjing Fu

Vibroengineering Procedia · 22.04.2026 · 61 · 158-165

DOI: 10.21595/vp.2026.25947 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Vibroengineering Procedia, online erschienen am 22.04.2026. Verfasst von Zhentian Yang und 2 weiteren Autor:innen. Die Arbeit nennt 13 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study focuses on a double-tower, double-plane prestressed concrete cable-stayed bridge with a span arrangement of 75+130+365+130+75 m. A full-bridge finite element model was developed using Midas Civil, and a monitoring system was established to track main girder alignment, cable forces, and structural stresses. A phased control and monitoring strategy is implemented: alignment control is prioritized during the cantilever casting stage, while cable force and stress control take precedence during the closure stage. Monitoring results indicate that the alignment of the completed bridge's main girder is smooth, with cable force deviations controlled within 10 %, and stresses in both the main girder and pylons remaining within safe limits. This study integrates dynamic control and monitoring strategies, offering practical references for the construction control of similar bridges.

Zitieren

APA

Yang, Z., Wang, X., & Fu, W. (2026). Monitoring and control technologies for the full-process construction of a long-span cable-stayed bridge. Vibroengineering Procedia, 61, 158-165. https://doi.org/10.21595/vp.2026.25947

Vancouver

Yang Z, Wang X, Fu W. Monitoring and control technologies for the full-process construction of a long-span cable-stayed bridge. Vibroengineering Procedia. 2026;61:158-165. doi:10.21595/vp.2026.25947

BibTeX
@article{Yang2026,
  author = {Yang, Zhentian and Wang, Xiaotang and Fu, Wanjing},
  title = {Monitoring and control technologies for the full-process construction of a long-span cable-stayed bridge},
  journal = {Vibroengineering Procedia},
  year = {2026},
  volume = {61},
  pages = {158--165},
  doi = {10.21595/vp.2026.25947}
}
Kostenlos starten →