Fachartikel in der Zeitschrift Buildings, online erschienen am 17.10.2024. Verfasst von Mengsheng Yu und 4 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 27 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, The Scientific and Technological Project of the Science and Technology Department of Guangxi Province.
Abstract (Originalsprache)
The construction duration of long-span arch bridges is excessively prolonged due to insufficient closing precision and the non-convergence of traditional cable adjustment calculation methods. This study investigates cable force management in long-span concrete-filled steel tubular (CFST) arch bridges during cable-stayed buckle construction, aiming to improve construction safety and precision in arch rib alignment. Using the Pingnan Third Bridge and Tian’e Longtan Bridge as practical examples, the research develops a multi-objective optimization method for cable forces that integrates influence matrices, constrained minimization, and a forward iterative approach. This method offers a robust strategy for tensioning and cable-stayed buckling, enabling real-time monitoring, calculation, and adjustment during the construction of large-span CFST arch bridges. The results reveal that the iterative approach notably enhances calculation efficiency compared to conventional methods. For instance, field measurements at the Pingnan Third Bridge show a minimal arch closure error of only 3 mm. Additionally, the study addresses concerns about excessive stress in exposed steel tubes during concrete casting. By optimizing the sequence of main arch closure and concrete casting, stress in the exposed steel tube is reduced from 373 MPa to 316 MPa, thus meeting specification requirements. In summary, the multi-objective cable force optimization method demonstrates superior efficiency in determining cable tension and controlling rib alignment during cable-stayed buckle construction of long-span CFST arch bridges.
Förderung
- National Natural Science Foundation of China
- The Scientific and Technological Project of the Science and Technology Department of Guangxi Province
Zitieren
APA
Yu, M., Yao, X., Wang, L., Hao, T., & Deng, N. (2024). Rib Alignment Control of Long-Span Arch Bridge in Cable-Stayed Buckle by Multi-Objective Optimization. Buildings, 14(10), 3281. https://doi.org/10.3390/buildings14103281
Vancouver
Yu M, Yao X, Wang L, Hao T, Deng N. Rib Alignment Control of Long-Span Arch Bridge in Cable-Stayed Buckle by Multi-Objective Optimization. Buildings. 2024;14(10):3281. doi:10.3390/buildings14103281
BibTeX
@article{Yu2024,
author = {Yu, Mengsheng and Yao, Xinyu and Wang, Longlin and Hao, Tianzhi and Deng, Nianchun},
title = {Rib Alignment Control of Long-Span Arch Bridge in Cable-Stayed Buckle by Multi-Objective Optimization},
journal = {Buildings},
year = {2024},
volume = {14},
number = {10},
pages = {3281},
doi = {10.3390/buildings14103281}
}
EUVIMED