Process Improvement for Material Addressing and Warehousing in a Furniture Factory
Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi · 05.11.2026 · 27 (4) · 1-19
DOI: 10.17474/artvinofd.1979317 ↗Kurz gefasst
Fachartikel in der Zeitschrift Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi, online erschienen am 05.11.2026. Verfasst von Veli Çelik und 1 weiteren Autor:innen. Die Arbeit nennt 16 Literaturangaben.
Abstract (Originalsprache)
In today's world, excessive inventory in furniture factories leads to waste and unnecessary warehouse costs, while just-in-time material delivery is essential for just-in-time production. Therefore, in this study, process improvement studies were carried out in a furniture company in the light of process improvement methods. 5S studies were carried out in the primary material warehouse and other warehouses during the planned renovation and development works at the primary material warehouse. Warehouse processes were analyzed and process improvement studies were carried out in order to reduce the duration of processes such as addressing and Kanban preparation. First material warehouse was completely renewed and the number of addresses from 4600 tripled and reached approximately 14000. In terms of surface area, the warehouse area has been increased from 875 m² to 1650 m². The materials were grouped according to various criteria and their addresses were determined. Thanks to this addressing, a 25% improvement in Kanban preparation time has been achieved. In the metal profile warehouse, 6% improvements were made in the storage area by switching from the car transport system to the conveyor system.
Zitieren
APA
Çelik, V., & Fidan, M. S. (2026). Process Improvement for Material Addressing and Warehousing in a Furniture Factory. Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi, 27(4), 1-19. https://doi.org/10.17474/artvinofd.1979317
Vancouver
Çelik V, Fidan MS. Process Improvement for Material Addressing and Warehousing in a Furniture Factory. Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi. 2026;27(4):1-19. doi:10.17474/artvinofd.1979317
BibTeX
@article{elik2026,
author = {Çelik, Veli and Fidan, Muhammed Said},
title = {Process Improvement for Material Addressing and Warehousing in a Furniture Factory},
journal = {Artvin Çoruh Üniversitesi Orman Fakültesi Dergisi},
year = {2026},
volume = {27},
number = {4},
pages = {1--19},
doi = {10.17474/artvinofd.1979317}
}
EUVIMED