EUVIMEDEUVIMED entdecken
Crossref

Evaluation of Agile Construction in Managing Time Delays in the Bhutanese Construction Industry

Leki Wangmo, Mukas Subba, Roshan Sharma

Zorig Melong | A Technical Journal of Science, Engineering and Technology · 2015

DOI: 10.17102/zmv2.i1.003 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Zorig Melong | A Technical Journal of Science, Engineering and Technology, 2015. Verfasst von Leki Wangmo und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This research study is carried out to find the ways to economize and improve the standard of the construction work using agile techniques. As projects become increasingly complicated, schedule delays are common and at times inevitable in construction. Those delays would ultimately result in reworks, cost overruns and legal claims. Hence, the initial motivation for this research is to explore a systematic flexibility to deal with delays caused by complex changes in construction and meanwhile to enhance the overall project performance. Since the agility and relevant theories are emerging techniques in construction, the proposed agile ideas and enablers are verified by qualitative interviews with construction professionals. With the ultimate goal of reducing delays, a case study was conducted, investigating how much delays could be reduced if the agile enablers were implemented.

Zitieren

APA

Wangmo, L., Subba, M., & Sharma, R. (2015). Evaluation of Agile Construction in Managing Time Delays in the Bhutanese Construction Industry. Zorig Melong | A Technical Journal of Science, Engineering and Technology. https://doi.org/10.17102/zmv2.i1.003

Vancouver

Wangmo L, Subba M, Sharma R. Evaluation of Agile Construction in Managing Time Delays in the Bhutanese Construction Industry. Zorig Melong | A Technical Journal of Science, Engineering and Technology. 2015. doi:10.17102/zmv2.i1.003

BibTeX
@article{Wangmo2015,
  author = {Wangmo, Leki and Subba, Mukas and Sharma, Roshan},
  title = {Evaluation of Agile Construction in Managing Time Delays in the Bhutanese Construction Industry},
  journal = {Zorig Melong | A Technical Journal of Science, Engineering and Technology},
  year = {2015},
  doi = {10.17102/zmv2.i1.003}
}
Kostenlos starten →