EUVIMEDEUVIMED entdecken
Crossref

Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand

David Finnie, Naseem Ameer Ali, Kenneth Park

Proceedings of the Institution of Civil Engineers - Management, Procurement and Law · 01.08.2018 · 171 (4) · 176-185

DOI: 10.1680/jmapl.17.00029 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, erschienen am 01.08.2018. Verfasst von David Finnie und 2 weiteren Autor:innen. Die Arbeit wurde bisher 14-mal zitiert (Crossref) und nennt 63 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Procurement strategies that enable early contractor involvement (ECI) in design may enhance off-site manufacturing (OSM) by overcoming previously identified barriers to its uptake. Involving constructors during the design stage can reduce the risk of design buildability issues, and standardising traditionally bespoke ECI processes may help overcome cultural resistance to unfamiliar OSM technology. Following literature review and using case studies, document analysis and legal doctrine, a two-stage ECI conceptual process model for New Zealand is proposed. This was tested and refined following feedback at a conference. The model comprises a first-stage pre-construction contract and a second-stage standard-form construction contract. Key process variables are considered with solutions to provide collaboration and transparency while maintaining competitive fixed pricing across the supply chain. Legal doctrine analysis is used to distinguish between design buildability obligations and design codes compliance. The model contributes towards the development of a standard form for pre-construction contracts.

Zitieren

APA

Finnie, D., Ali, N. A., & Park, K. (2018). Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 171(4), 176-185. https://doi.org/10.1680/jmapl.17.00029

Vancouver

Finnie D, Ali NA, Park K. Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law. 2018;171(4):176-185. doi:10.1680/jmapl.17.00029

BibTeX
@article{Finnie2018,
  author = {Finnie, David and Ali, Naseem Ameer and Park, Kenneth},
  title = {Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand},
  journal = {Proceedings of the Institution of Civil Engineers - Management, Procurement and Law},
  year = {2018},
  volume = {171},
  number = {4},
  pages = {176--185},
  doi = {10.1680/jmapl.17.00029}
}
Kostenlos starten →