Evaluating the Impact of Early Contractor Involvement on Enhancing the Performance of Construction Projects in Egypt
Mansoura Engineering Journal · 13.06.2026 · 51 (3)
DOI: 10.58491/2735-4202.3432 ↗Kurz gefasst
Fachartikel in der Zeitschrift Mansoura Engineering Journal, online erschienen am 13.06.2026. Verfasst von Samah Saleh Abdelraof und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The construction industry constitutes a critical pillar of Egypt’s national economic growth and sustainable development. Despite its strategic importance, the sector continues to face persistent challenges, including chronic cost overruns, schedule delays, and inadequate coordination among stakeholders. These inefficiencies are largely attributed to the dominance of the traditional Design–Bid–Build (DBB) system, which enforces a rigid separation between design and construction, fostering adversarial relationships and project disputes, which highlights the need for alternative procurement approaches. This research investigates the impact of Early Contractor Involvement (ECI) as a collaborative procurement alternative to enhance project performance. Case studies show that ECI improves early-stage coordination, risk identification, constructability, value engineering, and communication among stakeholders, reducing design changes and enhancing overall project outcomes. The study’s statistical analysis reveals a strong professional consensus regarding the benefits of ECI, with 90% of respondents confirming its ability to reduce total project expenditures and 80% supporting its role in accelerating delivery timelines. Furthermore, 85% of participants noted that ECI leads to superior design quality and constructability, while 90% agreed that early involvement significantly mitigates financial and schedule-related risks. However, despite this high level of theoretical support, the practical application of ECI in Egypt remains limited. The findings identify a complex set of barriers hindering ECI localisation, most notably a lack of supportive legal frameworks under Law No. 182/2018, which continues to favour price-based competition over value-based integration. Additionally, the sector is constrained by an adversarial culture, a shortage of design-oriented technical expertise among contractors, and the underutilization of digital collaboration tools such as Building Information Modelling (BIM). This research concludes by offering context-specific recommendations, including the adoption of Pre-Construction Service Agreements (PCSA) and legislative reforms. By transitioning from fragmented procurement toward a partnership-oriented culture, the Egyptian construction industry can align stakeholder objectives to ensure enhanced cost certainty, superior schedule performance, and overall project success.
Zitieren
APA
Abdelraof, S. S., Othman, A. A. E., & Ahmed, L. M. (2026). Evaluating the Impact of Early Contractor Involvement on Enhancing the Performance of Construction Projects in Egypt. Mansoura Engineering Journal, 51(3). https://doi.org/10.58491/2735-4202.3432
Vancouver
Abdelraof SS, Othman AAE, Ahmed LM. Evaluating the Impact of Early Contractor Involvement on Enhancing the Performance of Construction Projects in Egypt. Mansoura Engineering Journal. 2026;51(3). doi:10.58491/2735-4202.3432
BibTeX
@article{Abdelraof2026,
author = {Abdelraof, Samah Saleh and Othman, Ayman Ahmed Ezzat and Ahmed, Lamees Mostafa},
title = {Evaluating the Impact of Early Contractor Involvement on Enhancing the Performance of Construction Projects in Egypt},
journal = {Mansoura Engineering Journal},
year = {2026},
volume = {51},
number = {3},
doi = {10.58491/2735-4202.3432}
}
EUVIMED