EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Hybrid approach for cost estimation of sustainable building projects using artificial neural networks

Jumaa A. Al-Somaydaii, Aminah T. Albadri, Faiq M. S. Al-Zwainy

Open Engineering · 20.03.2024 · 14 (1)

DOI: 10.1515/eng-2022-0485 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Open Engineering, online erschienen am 20.03.2024. Verfasst von Jumaa A. Al-Somaydaii und 2 weiteren Autor:innen. Die Arbeit wurde bisher 18-mal zitiert (Crossref) und nennt 18 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Inaccurate estimation in sustainable construction projects is a significant challenge for appraisers, particularly when data and knowledge about the projects are lacking. As a result, there is a need to use cutting-edge technology to solve the issue of estimation inaccuracy. Iraq’s productivity estimates are now made using outdated, ineffective methodologies and procedures. In addition, it is essential to implement cutting-edge, quick, precise, and adaptable technology for productivity estimation. This study’s major goal is to calculate the overall costs of sustainable buildings using the cutting-edge technique known as artificial neural networks (ANNs). For Iraq’s construction industry to handle projects successfully, ANNs must be used as a new technology, a methodology developed to estimate the overall costs of sustainable construction projects. In this study, the process of cost estimation was modeled using ANNs. Investigations of a number of examples involving the creation of ANNs have also been made, including network design and internal elements and how much they impact the effectiveness of models built using ANNs. Equations were developed to determine structural productivity. These networks were shown to have extremely strong predictive power for both accounting coefficients ( R ) (93.33%) and the overall costs of sustainable construction projects, with a prediction accuracy of 87.00 and 93.33%, respectively.

Zitieren

APA

Al-Somaydaii, J. A., Albadri, A. T., & Al-Zwainy, F. M. S. (2024). Hybrid approach for cost estimation of sustainable building projects using artificial neural networks. Open Engineering, 14(1). https://doi.org/10.1515/eng-2022-0485

Vancouver

Al-Somaydaii JA, Albadri AT, Al-Zwainy FMS. Hybrid approach for cost estimation of sustainable building projects using artificial neural networks. Open Engineering. 2024;14(1). doi:10.1515/eng-2022-0485

BibTeX
@article{AlSomaydaii2024,
  author = {Al-Somaydaii, Jumaa A. and Albadri, Aminah T. and Al-Zwainy, Faiq M. S.},
  title = {Hybrid approach for cost estimation of sustainable building projects using artificial neural networks},
  journal = {Open Engineering},
  year = {2024},
  volume = {14},
  number = {1},
  doi = {10.1515/eng-2022-0485}
}
Kostenlos starten →