Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study
International Journal of Agile Systems and Management · 2026 · 19 (2) · 135-168
DOI: 10.1504/ijasm.2026.152893 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Agile Systems and Management, 2026. Verfasst von Mahmoud Darvishnezhad und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Darvishnezhad, M., Hoseini, S. F., Zareei, H., & Soltani, R. (2026). Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study. International Journal of Agile Systems and Management, 19(2), 135-168. https://doi.org/10.1504/ijasm.2026.152893
Vancouver
Darvishnezhad M, Hoseini SF, Zareei H, Soltani R. Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study. International Journal of Agile Systems and Management. 2026;19(2):135-168. doi:10.1504/ijasm.2026.152893
BibTeX
@article{Darvishnezhad2026,
author = {Darvishnezhad, Mahmoud and Hoseini, Seyed Farzad and Zareei, Hassan and Soltani, Roya},
title = {Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study},
journal = {International Journal of Agile Systems and Management},
year = {2026},
volume = {19},
number = {2},
pages = {135--168},
doi = {10.1504/ijasm.2026.152893}
}
EUVIMED