EUVIMEDEUVIMED entdecken
Crossref

Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study

Mahmoud Darvishnezhad, Seyed Farzad Hoseini, Hassan Zareei, Roya Soltani

International Journal of Agile Systems and Management · 2026 · 19 (2) · 135-168

DOI: 10.1504/ijasm.2026.152893 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Agile Systems and Management, 2026. Verfasst von Mahmoud Darvishnezhad und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Darvishnezhad, M., Hoseini, S. F., Zareei, H., & Soltani, R. (2026). Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study. International Journal of Agile Systems and Management, 19(2), 135-168. https://doi.org/10.1504/ijasm.2026.152893

Vancouver

Darvishnezhad M, Hoseini SF, Zareei H, Soltani R. Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study. International Journal of Agile Systems and Management. 2026;19(2):135-168. doi:10.1504/ijasm.2026.152893

BibTeX
@article{Darvishnezhad2026,
  author = {Darvishnezhad, Mahmoud and Hoseini, Seyed Farzad and Zareei, Hassan and Soltani, Roya},
  title = {Multi-mode resource-constrained project scheduling problem with payment periods to maximise the net present value: a case study},
  journal = {International Journal of Agile Systems and Management},
  year = {2026},
  volume = {19},
  number = {2},
  pages = {135--168},
  doi = {10.1504/ijasm.2026.152893}
}
Kostenlos starten →