A chance-constrained robust model for the multi-mode resource-constrained project scheduling problem with uncertain activity durations
Computers & Industrial Engineering · 2027-01 · 223 · 112481
DOI: 10.1016/j.cie.2026.112481 ↗Kurz gefasst
Fachartikel in der Zeitschrift Computers & Industrial Engineering, 2027-01. Verfasst von Changchun Liu. Die Arbeit nennt 58 Literaturangaben. Gefördert von: National Natural Science Foundation of China.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Förderung
- National Natural Science Foundation of China
Zitieren
APA
Liu, C. (2027). A chance-constrained robust model for the multi-mode resource-constrained project scheduling problem with uncertain activity durations. Computers & Industrial Engineering, 223, 112481. https://doi.org/10.1016/j.cie.2026.112481
Vancouver
Liu C. A chance-constrained robust model for the multi-mode resource-constrained project scheduling problem with uncertain activity durations. Computers & Industrial Engineering. 2027;223:112481. doi:10.1016/j.cie.2026.112481
BibTeX
@article{Liu2027,
author = {Liu, Changchun},
title = {A chance-constrained robust model for the multi-mode resource-constrained project scheduling problem with uncertain activity durations},
journal = {Computers & Industrial Engineering},
year = {2027},
volume = {223},
pages = {112481},
doi = {10.1016/j.cie.2026.112481}
}
EUVIMED