Crossref
Stress Analysis of Steel Plate Splice Structure for Widened Continuous Concrete Beam Bridge Using Partial Splicing Method
ACI Structural Journal · 2027
DOI: 10.14359/51752106 ↗Kurz gefasst
Fachartikel in der Zeitschrift ACI Structural Journal, 2027. Verfasst von Qu Wang und 5 weiteren Autor:innen. Die Arbeit nennt 25 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Wang, Q., Li, Y., Zeng, Z., Yang, Y., Huang, M., & Wu, Q. (2027). Stress Analysis of Steel Plate Splice Structure for Widened Continuous Concrete Beam Bridge Using Partial Splicing Method. ACI Structural Journal. https://doi.org/10.14359/51752106
Vancouver
Wang Q, Li Y, Zeng Z, Yang Y, Huang M, Wu Q. Stress Analysis of Steel Plate Splice Structure for Widened Continuous Concrete Beam Bridge Using Partial Splicing Method. ACI Structural Journal. 2027. doi:10.14359/51752106
BibTeX
@article{Wang2027,
author = {Wang, Qu and Li, Yiyang and Zeng, Zhaoyi and Yang, Yanqun and Huang, Meifeng and Wu, Qingxiong},
title = {Stress Analysis of Steel Plate Splice Structure for Widened Continuous Concrete Beam Bridge Using Partial Splicing Method},
journal = {ACI Structural Journal},
year = {2027},
doi = {10.14359/51752106}
}
EUVIMED