Scheduling Repair Resources for Post‐Disaster Critical Infrastructure Systems: A Review of Models and Algorithms
Risk Analysis · 2026-04 · 46 (4)
DOI: 10.1111/risa.70220 ↗Kurz gefasst
Fachartikel in der Zeitschrift Risk Analysis, online erschienen am 12.03.2026. Verfasst von Min Xu und 4 weiteren Autor:innen. Beteiligte Einrichtung: School of Public Administration, Dongbei University of Finance and Economics, Dalian, China. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 194 Literaturangaben. Gefördert von: National Key Research and Development Program of China, National Natural Science Foundation of China, Project of Interdisciplinary Research Support Program in HUST.
Abstract (Originalsprache)
Natural hazards such as earthquakes, floods, and tropical cyclones pose significant threats to the operation of critical infrastructure systems (CISs) in urban environments. Rapid recovery of post‐disaster CISs is essential not only for mitigating immediate socio‐economic impacts but also for strengthening urban resilience against future shocks. A key challenge in this recovery process is the efficient scheduling of resources to repair damaged infrastructure, a task complicated by the dynamic and uncertain post‐disaster environment, the interdependencies within infrastructure networks, and the diverse priorities and demands of various stakeholders. Given the multifaceted nature of these challenges, numerous repair resource scheduling models have been developed, each incorporating distinct algorithmic strategies tailored to different disaster types and infrastructure systems. Despite a growing body of literature on optimization problems in disaster recovery, a comprehensive understanding of the variations in these models and methods remains lacking. This review aims to systematically explore and synthesize the landscape of repair resource scheduling models, highlighting model variants and their solution algorithms. In particular, it addresses the emerging challenges in post‐disaster recovery, exacerbated by the coupled effects of climate change and rapid urbanization. By categorizing the variants and extensions of existing models, this study seeks to refine current frameworks and inspire the development of more comprehensive models, ultimately contributing to more informed restoration decisions and enhanced resilience of urban infrastructure systems.
Schlagwörter
Stichwörter der Autor:innen
Autor:innen und Institutionen
- School of Public Administration, Dongbei University of Finance and Economics, Dalian, China.
- School of Artificial Intelligence and Automation, Huazhong University of Science and Technology, Wuhan, China.
- Key Laboratory for Image Processing and Intelligent Control, Huazhong University of Science and Technology, Ministry of Education, Wuhan, China.
- School of Information Management, Wuhan University, Wuhan, China.
- School of Management, Huazhong University of Science and Technology, Wuhan, China.
ORCID-Profile: Min Xu, Chongyang Du
Förderung
- National Key Research and Development Program of China
- National Natural Science Foundation of China
- Project of Interdisciplinary Research Support Program in HUST
Zitieren
APA
Xu, M., Ouyang, M., Du, C., Zhang, H., & Wang, H. (2026). Scheduling Repair Resources for Post‐Disaster Critical Infrastructure Systems: A Review of Models and Algorithms. Risk Analysis, 46(4). https://doi.org/10.1111/risa.70220
Vancouver
Xu M, Ouyang M, Du C, Zhang H, Wang H. Scheduling Repair Resources for Post‐Disaster Critical Infrastructure Systems: A Review of Models and Algorithms. Risk Analysis. 2026;46(4). doi:10.1111/risa.70220
BibTeX
@article{Xu2026,
author = {Xu, Min and Ouyang, Min and Du, Chongyang and Zhang, Hui and Wang, Hongwei},
title = {Scheduling Repair Resources for Post‐Disaster Critical Infrastructure Systems: A Review of Models and Algorithms},
journal = {Risk Analysis},
year = {2026},
volume = {46},
number = {4},
doi = {10.1111/risa.70220}
}
EUVIMED