Central Controller for Photovoltaic Power Plants With Hybrid Energy Storage Systems Providing Automatic Frequency Restoration Reserve
IEEE Transactions on Sustainable Energy · 2026-07 · 17 (3) · 2543-2557
DOI: 10.1109/tste.2026.3653342 ↗Kurz gefasst
Fachartikel in der Zeitschrift IEEE Transactions on Sustainable Energy, 2026-07. Verfasst von Juan Diego Rios-Peñaloza und 3 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).
Abstract (Originalsprache)
Large-scale photovoltaic (PV) power plants have been increasingly used in ancillary service markets, providing services at significantly different time scales. These plants require additional flexibility to provide different services simultaneously and the solution is often sought in application of hybrid energy storage systems (HESSs). In HESSs, the power demand is shared between the storage units to maximise their performance and lifetime. However, this requires a detailed model of all storage elements that must be taken into account by the central controller of the PV plant. This aspect has not been yet studied in detail in the literature. In this paper, a central controller is proposed for a PV power plant with a HESS. This controller allows the PV plant to participate simultaneously in the day-ahead and the secondary reserve markets, providing both energy and power reserve services. First, the assets are scheduled in an optimal way, considering a horizon of 24 hours and taking into consideration weather forecasts and the expected balancing energy requests. Then, a short-term rolling-horizon optimisation with a time horizon of 30 minutes is used to consider the real operating conditions of the PV power plant and state of the storage units. The efficiency of each of the storage elements is modelled in detail for the short-term optimisation. The proposed controller is applied to a test case consisting of a 20 MW PV power plant with a HESS based on a lithium-ion battery and a redox-flow battery, each with 5 MW power and 10 MWh capacity. The main contributions are verified by using numerical simulations performed in MATLAB/Simulink for the electrical system and Gurobi for the optimisation procedures.
Zitieren
APA
Rios-Peñaloza, J. D., Prevedi, A., Prodanović, M., & Roldán-Pérez, J. (2026). Central Controller for Photovoltaic Power Plants With Hybrid Energy Storage Systems Providing Automatic Frequency Restoration Reserve. IEEE Transactions on Sustainable Energy, 17(3), 2543-2557. https://doi.org/10.1109/tste.2026.3653342
Vancouver
Rios-Peñaloza JD, Prevedi A, Prodanović M, Roldán-Pérez J. Central Controller for Photovoltaic Power Plants With Hybrid Energy Storage Systems Providing Automatic Frequency Restoration Reserve. IEEE Transactions on Sustainable Energy. 2026;17(3):2543-2557. doi:10.1109/tste.2026.3653342
BibTeX
@article{RiosPealoza2026,
author = {Rios-Peñaloza, Juan Diego and Prevedi, Andrea and Prodanović, Milan and Roldán-Pérez, Javier},
title = {Central Controller for Photovoltaic Power Plants With Hybrid Energy Storage Systems Providing Automatic Frequency Restoration Reserve},
journal = {IEEE Transactions on Sustainable Energy},
year = {2026},
volume = {17},
number = {3},
pages = {2543--2557},
doi = {10.1109/tste.2026.3653342}
}
EUVIMED