A Two-Step Decomposition Approach for Stochastic Mid-Term Power Generation Planning With Disjunctive Constraints for Reservoirs

Lílian C. Brandão, André L. Diniz, Bruno Henriques Dias

IEEE Access · 2026 · 14 · 98726-98740

DOI: 10.1109/access.2026.3704030 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IEEE Access, 2026. Verfasst von Lílian C. Brandão und 2 weiteren Autor:innen. Die Arbeit nennt 50 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Article Processing Charges (APC) provided by the Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES), National Council for Scientific and Technological Development.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Power generation planning in large-scale hydrothermal systems faces significant challenges due to uncertainty in water inflows, temporal coupling in the operation of large reservoirs, and complex cascade arrangements. Traditional decomposition techniques such as Dual Dynamic Programming (DDP) and Stochastic Dual Dynamic Programming (SDDP) are widely used, but struggle to accurately model disjunctive (conditional) constraints that require integer variables, leading to non-convexities and suboptimal solutions. Those constraints appear in operating rules for storage and discharge decisions of some hydro plants, such as minimum discharge requirements to maintain river flow, which are conditioned on reservoir storage levels along the cascade. To tackle this real-world problem, this work proposes a novel two-step decomposition methodology that combines standard Benders or Strengthened Benders approaches with a simplified binary variable representation for reservoir volumes to address disjunctive constraints. This approach enables the efficient application of Stochastic Dynamic Dual Integer Programming (SDDiP) without the need for binary expansion, thereby improving solution quality in reasonable computational performance. The method is validated on a realistic case study based on the Brazilian power system, demonstrating a reduction in the optimality gap corresponding to approximately ${\$}400$ million in operational cost savings, along with improved operational strategies compared to conventional approaches. The results highlight the importance of accurate modeling of conditional hydraulic constraints and the potential for scalable and computationally efficient planning approaches in hydro-dominated systems.

Förderung

  • Article Processing Charges (APC) provided by the Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
  • National Council for Scientific and Technological Development

Zitieren

APA

Brandão, L. C., Diniz, A. L., & Dias, B. H. (2026). A Two-Step Decomposition Approach for Stochastic Mid-Term Power Generation Planning With Disjunctive Constraints for Reservoirs. IEEE Access, 14, 98726-98740. https://doi.org/10.1109/access.2026.3704030

Vancouver

Brandão LC, Diniz AL, Dias BH. A Two-Step Decomposition Approach for Stochastic Mid-Term Power Generation Planning With Disjunctive Constraints for Reservoirs. IEEE Access. 2026;14:98726-98740. doi:10.1109/access.2026.3704030

BibTeX
@article{Brando2026,
  author = {Brandão, Lílian C. and Diniz, André L. and Dias, Bruno Henriques},
  title = {A Two-Step Decomposition Approach for Stochastic Mid-Term Power Generation Planning With Disjunctive Constraints for Reservoirs},
  journal = {IEEE Access},
  year = {2026},
  volume = {14},
  pages = {98726--98740},
  doi = {10.1109/access.2026.3704030}
}