EUVIMEDEUVIMED entdecken
Crossref

Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

Seolhee Cho, Javier Tovar-Facio, Ignacio E. Grossmann

Computers & Chemical Engineering · 2023-06 · 174 · 108243

DOI: 10.1016/j.compchemeng.2023.108243 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Computers & Chemical Engineering, 2023-06. Verfasst von Seolhee Cho und 2 weiteren Autor:innen. Die Arbeit wurde bisher 23-mal zitiert (Crossref) und nennt 44 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize reserve systems (or backup systems), as well as the main systems, to improve power systems reliability. An impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power systems reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power systems reliability depending on design and operation strategies. The optimization model is formulated with Generalized Disjunctive Programming (GDP), which is reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing the results with the results obtained from the expansion planning models that do not explicitly consider reliability. We also show that the proposed bilevel decomposition is computationally efficient for solving large scale problems through 5-years and 10-years planning case studies.

Zitieren

APA

Cho, S., Tovar-Facio, J., & Grossmann, I. E. (2023). Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. Computers & Chemical Engineering, 174, 108243. https://doi.org/10.1016/j.compchemeng.2023.108243

Vancouver

Cho S, Tovar-Facio J, Grossmann IE. Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. Computers & Chemical Engineering. 2023;174:108243. doi:10.1016/j.compchemeng.2023.108243

BibTeX
@article{Cho2023,
  author = {Cho, Seolhee and Tovar-Facio, Javier and Grossmann, Ignacio E.},
  title = {Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems},
  journal = {Computers & Chemical Engineering},
  year = {2023},
  volume = {174},
  pages = {108243},
  doi = {10.1016/j.compchemeng.2023.108243}
}
Kostenlos starten →