EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Integrated Scheduling Model and Method for Equipment O&M and Spare Parts Production under Fuzzy Supply–Demand Time Windows

Qiang Luo, Jianyu Long, Yunwei Huang, Chuan Li, Zhiqiang Zeng, Qianwang Deng

Journal of Computational Design and Engineering · 12.11.2026

DOI: 10.1093/jcde/qwag101 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Computational Design and Engineering, online erschienen am 12.11.2026. Verfasst von Qiang Luo und 5 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Integrating equipment operation and maintenance (O&M) with spare parts production is critical to ensuring operational reliability of complex equipment systems, but these decisions are typically considered separately in existing studies. Moreover, most studies assume deterministic environments, overlooking uncertainties in the supply and demand times of spare parts. This paper considers an integrated scheduling problem of equipment maintenance and spare parts production under fuzzy supply-demand time windows. First, triangular fuzzy numbers are used to reflect the fuzzy processing times on the production side and the fuzzy failure times on the demand side, and an integrated scheduling model is built to coordinate production and O&M decisions under dual uncertainty. Second, a customer satisfaction evaluation model based on fuzzy relative entropy is developed to quantify the alignment between fuzzy supply and demand time windows. Third, a learning-based multi-population collaborative evolutionary algorithm (LMCEA) is designed, incorporating an adaptive population decomposition mechanism, collaborative global search and local search operators. Numerical experiments across 40 instances show that LMCEA outperforms three state-of-the-art algorithms on four established metrics. Meanwhile, robustness analysis is conducted under four uncertainty levels, and the results further confirm the stability of the proposed approach. The proposed framework provides a decision-making tool for coordinating coupled production and maintenance processes in fuzzy supply and demand environments.

Zitieren

APA

Luo, Q., Long, J., Huang, Y., Li, C., Zeng, Z., & Deng, Q. (2026). Integrated Scheduling Model and Method for Equipment O&M and Spare Parts Production under Fuzzy Supply–Demand Time Windows. Journal of Computational Design and Engineering. https://doi.org/10.1093/jcde/qwag101

Vancouver

Luo Q, Long J, Huang Y, Li C, Zeng Z, Deng Q. Integrated Scheduling Model and Method for Equipment O&M and Spare Parts Production under Fuzzy Supply–Demand Time Windows. Journal of Computational Design and Engineering. 2026. doi:10.1093/jcde/qwag101

BibTeX
@article{Luo2026,
  author = {Luo, Qiang and Long, Jianyu and Huang, Yunwei and Li, Chuan and Zeng, Zhiqiang and Deng, Qianwang},
  title = {Integrated Scheduling Model and Method for Equipment O&M and Spare Parts Production under Fuzzy Supply–Demand Time Windows},
  journal = {Journal of Computational Design and Engineering},
  year = {2026},
  doi = {10.1093/jcde/qwag101}
}
Kostenlos starten →