EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Preventive spare parts supply strategy for large-scale equipment based on performance degradation

Yongjia Gao iD, Jieyu Liu iD, Can Li, Qiang Shen, Ruiyan Zhang, Zhichao Feng

PLOS One · 17.06.2026 · 21 (6) · e0348476

DOI: 10.1371/journal.pone.0348476 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PLOS One, online erschienen am 17.06.2026. Verfasst von Yongjia Gao und 5 weiteren Autor:innen. Beteiligte Einrichtung: The Rocket Force University of Engineering, Xi'an, Shaanxi, P.R. China. Hauptthemen laut MEDLINE: Equipment and Supplies. Die Arbeit nennt 49 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Natural Science Foundation of China, Shanxi Provincial Natural Science Foundation Youth Project.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Timely replacement of spare parts can improve the reliability of large-scale equipment operation and is the critical link of preventive maintenance. This paper studies how to reasonably formulate spare parts supply strategy in large-scale equipment maintenance. Given the shortcomings of the conventional fixed cycle replacement method of equipment spare parts, a spare parts replacement method based on large-scale equipment performance degradation is proposed. The proposed method can shorten downtime and avoid waste. Firstly, by analyzing the large-scale equipment’s performance state characteristics, the performance evaluation model of the equipment is established using the interval evidential reasoning approach, and the envelope of performance degradation can be obtained. Weibull distribution is used to fit the performance degradation envelope, and the bisection method and maximum likelihood estimation method are combined to identify the model parameters. The health degree envelope of large-scale equipment performance is obtained. Then, the number of spare parts required is calculated based on health degree expectation. Considering the time required for ordering and transporting spare parts, the spare parts ordering strategy is formulated under the condition of large-scale equipment working simultaneously. Finally, the proposed method is applied to a type of large-scale equipment to verify the effectiveness of the proposed method.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

Equipment and SuppliesMaintenanceModels, Theoretical

Autor:innen und Institutionen

  • The Rocket Force University of Engineering, Xi'an, Shaanxi, P.R. China.
  • The University of Science and Technology Beijing, Beijing, Beijing, P.R. China.

ORCID-Profile: Yongjia Gao, Jieyu Liu

Förderung

  • Natural Science Foundation of China
  • Shanxi Provincial Natural Science Foundation Youth Project

Zitieren

APA

Gao, Y., Liu, J., Li, C., Shen, Q., Zhang, R., & Feng, Z. (2026). Preventive spare parts supply strategy for large-scale equipment based on performance degradation. PLOS One, 21(6), e0348476. https://doi.org/10.1371/journal.pone.0348476

Vancouver

Gao Y, Liu J, Li C, Shen Q, Zhang R, Feng Z. Preventive spare parts supply strategy for large-scale equipment based on performance degradation. PLOS One. 2026;21(6):e0348476. doi:10.1371/journal.pone.0348476

BibTeX
@article{Gao2026,
  author = {Gao, Yongjia and Liu, Jieyu and Li, Can and Shen, Qiang and Zhang, Ruiyan and Feng, Zhichao},
  title = {Preventive spare parts supply strategy for large-scale equipment based on performance degradation},
  journal = {PLOS One},
  year = {2026},
  volume = {21},
  number = {6},
  pages = {e0348476},
  doi = {10.1371/journal.pone.0348476}
}
Kostenlos starten →