EUVIMEDObjevte EUVIMED
Open access · CC BY 4.0

Metal Requirements for Building Electrical Grid Systems of Global Wind Power and Utility-Scale Solar Photovoltaic until 2050

Zhenyang Chen iD, Rene Kleijn, Hai Xiang Lin

Environmental Science & Technology · 2023-01-17 · 57 (2) · 1080-1091

DOI: 10.1021/acs.est.2c06496 ↗

At a glance

Journal article in Environmental Science & Technology, published online on 2022-12-29. Written by Zhenyang Chen and 2 co-authors. Institution: Institute of Environmental Sciences (CML), Leiden University, Leiden2333 CC, The Netherlands. Major MEDLINE topics: Renewable Energy, Solar Energy. Cited 47 times so far (Crossref); 106 references. The full text is freely available (open access, CC BY 4.0).

AbstraktSubjectsBibliografické údajeCiteRelated studies

Abstract (original language)

Wind and solar photovoltaic (PV) power form vital parts of the energy transition toward renewable energy systems. The rapid development of these two renewables represents an enormous infrastructure construction task including both power generation and its associated electrical grid systems, which will generate demand for metal resources. However, most research on material demands has focused on their power generation systems (wind turbines and PV panels), and few have studied the associated electrical grid systems. Here, we estimate the global metal demands for electrical grid systems associated with wind and utility-scale PV power by 2050, using dynamic material flow analysis based on International Energy Agency's energy scenarios and the typical engineering parameters of transmission grids. Results show that the associated electrical grids require large quantities of metals: 27-81 Mt of copper cumulatively, followed by 20-67 Mt of steel and 11-31 Mt of aluminum. Electrical grids built for solar PV have the largest metal demand, followed by offshore and onshore wind. Power cables are the most metal-consuming electrical components compared to substations and transformers. We also discuss the decommissioning issue of electrical grids and their recovery potential. This study would deepen the understanding of the nexus between renewable energy, grid infrastructure, and metal resources.

Subjects

MeSH terms (MEDLINE)

Renewable EnergySolar EnergyElectric Power Supplies

Author keywords

material recyclingmineral resourcespower cablerenewable energytransmission infrastructure

Authors and institutions

  • Institute of Environmental Sciences (CML), Leiden University, Leiden2333 CC, The Netherlands.
  • Delft Institute of Applied Mathematics, Delft University of Technology, Delft2628 CD, The Netherlands.

ORCID profiles: Zhenyang Chen

Cite

APA

Chen, Z., Kleijn, R., & Lin, H. X. (2023). Metal Requirements for Building Electrical Grid Systems of Global Wind Power and Utility-Scale Solar Photovoltaic until 2050. Environmental Science & Technology, 57(2), 1080-1091. https://doi.org/10.1021/acs.est.2c06496

Vancouver

Chen Z, Kleijn R, Lin HX. Metal Requirements for Building Electrical Grid Systems of Global Wind Power and Utility-Scale Solar Photovoltaic until 2050. Environmental Science & Technology. 2023;57(2):1080-1091. doi:10.1021/acs.est.2c06496

BibTeX
@article{Chen2023,
  author = {Chen, Zhenyang and Kleijn, Rene and Lin, Hai Xiang},
  title = {Metal Requirements for Building Electrical Grid Systems of Global Wind Power and Utility-Scale Solar Photovoltaic until 2050},
  journal = {Environmental Science & Technology},
  year = {2023},
  volume = {57},
  number = {2},
  pages = {1080--1091},
  doi = {10.1021/acs.est.2c06496}
}
Start for free →