Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty

Xiaohui Zhang, Yufei Liu

Engineering Reports · 2024-12 · 6 (12)

DOI: 10.1002/eng2.13005 ↗

At a glance

Journal article in Engineering Reports, published online on 2024-09-22. Written by Xiaohui Zhang and 1 co-authors. Cited 5 times so far (Crossref); 17 references. The full text is freely available (open access, CC BY 4.0). Funded by: Department of Education of Liaoning Province.

AbstraktBibliografické údajeCiteRelated studies

Abstract (original language)

Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristics of robust optimization and stochastic optimization to model the source‐load uncertainty differentiation. The Wasserstein generative adversarial network with gradient penalty (WGAN‐GP) is used to generate electric and thermal load scenarios, and then K‐medoids clustering is used to obtain several typical scenarios. The min–max–min two‐stage stochastic robust optimization model is constructed, and the column constraint generation (C&CG) algorithm and dual theory are used to solve the problem, and the scheduling scheme with the lowest operating cost in the worst scenario is obtained.

Funding

  • Department of Education of Liaoning Province

Cite

APA

Zhang, X., & Liu, Y. (2024). Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty. Engineering Reports, 6(12). https://doi.org/10.1002/eng2.13005

Vancouver

Zhang X, Liu Y. Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty. Engineering Reports. 2024;6(12). doi:10.1002/eng2.13005

BibTeX
@article{Zhang2024,
  author = {Zhang, Xiaohui and Liu, Yufei},
  title = {Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty},
  journal = {Engineering Reports},
  year = {2024},
  volume = {6},
  number = {12},
  doi = {10.1002/eng2.13005}
}