Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
Engineering Reports · 2024-12 · 6 (12)
DOI: 10.1002/eng2.13005 ↗Kurz gefasst
Fachartikel in der Zeitschrift Engineering Reports, online erschienen am 22.09.2024. Verfasst von Xiaohui Zhang und 1 weiteren Autor:innen. Die Arbeit wurde bisher 5-mal zitiert (Crossref) und nennt 17 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: Department of Education of Liaoning Province.
Abstract (Originalsprache)
Aiming at the optimal scheduling problem of virtual power plant (VPP) with multiple uncertainties on the source‐load side, this paper proposes a two‐stage stochastic robust optimal scheduling method considering the uncertainty of the source‐load side. This method combines the characteristics of robust optimization and stochastic optimization to model the source‐load uncertainty differentiation. The Wasserstein generative adversarial network with gradient penalty (WGAN‐GP) is used to generate electric and thermal load scenarios, and then K‐medoids clustering is used to obtain several typical scenarios. The min–max–min two‐stage stochastic robust optimization model is constructed, and the column constraint generation (C&CG) algorithm and dual theory are used to solve the problem, and the scheduling scheme with the lowest operating cost in the worst scenario is obtained.
Förderung
- Department of Education of Liaoning Province
Zitieren
APA
Zhang, X., & Liu, Y. (2024). Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty. Engineering Reports, 6(12). https://doi.org/10.1002/eng2.13005
Vancouver
Zhang X, Liu Y. Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty. Engineering Reports. 2024;6(12). doi:10.1002/eng2.13005
BibTeX
@article{Zhang2024,
author = {Zhang, Xiaohui and Liu, Yufei},
title = {Two‐stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty},
journal = {Engineering Reports},
year = {2024},
volume = {6},
number = {12},
doi = {10.1002/eng2.13005}
}
EUVIMED