EUVIMEDEUVIMED entdecken
Crossref

Challenges In Implementing Sustainability-Related Risk Management Practices On Public-Private Partnership Road Projects In Zambia

Mutinta J. Malambo Mutinta J. Malambo

IOSR Journal of Business and Management · 2026-02 · 28 (2) · 34-39

DOI: 10.9790/487x-2802033439 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IOSR Journal of Business and Management, 2026-02. Verfasst von Mutinta J. Malambo Mutinta J. Malambo.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Background

The demand for sustainability-related risk management in the road construction industry especially those financed via the Public Private Partnerships is increasing and Zambia is no exception. This is mostly because sustainability risks exist everywhere in the business environment. While the majority of studies have focused on operational risk management practices, the current study centers on assessing the challenges concessionaires and other implementers face as regards Environmental and Social sustainability-related risk management practices associated with road projects being executed through the PPP financing model using the Lusaka Ndola dual carriage way as the case study. Materials and Methods: The researcher adopted a case study research design and utilized both quantitative and qualitative approaches, comprising of a detailed literature review and a structured questionnaire. Data was obtained from 40 professionals purposively selected from various institutions in the road construction industry. The Statistical Package for Social Sciences (SPSS) and Microsoft excel were used to analyse the data collected.

Results

Out of eight challenges confirmed, the study revealed three major implementation challenges as being significant and requiring attention, namely: (i) E&S issues not adequately planned and budgeted for by the concessionaire (34.4%); (ii) Inadequate sensitization of local stakeholders on E&S issues (31.3%); (iii) weak regulatory, monitoring and reporting oversight/mechanisms (15.6%).

Conclusion

The findings confirmed the assertion that “sustainability related risks such as those from the environmental and social dimensions are not adequately incorporated in road projects executed through the PPP model in Zambia owing to the key challenges faced by implementers and concessionaires”

Zitieren

APA

Malambo, M. J. M. M. J. (2026). Challenges In Implementing Sustainability-Related Risk Management Practices On Public-Private Partnership Road Projects In Zambia. IOSR Journal of Business and Management, 28(2), 34-39. https://doi.org/10.9790/487x-2802033439

Vancouver

Malambo MJMMJ. Challenges In Implementing Sustainability-Related Risk Management Practices On Public-Private Partnership Road Projects In Zambia. IOSR Journal of Business and Management. 2026;28(2):34-39. doi:10.9790/487x-2802033439

BibTeX
@article{Malambo2026,
  author = {Malambo, Mutinta J. Malambo Mutinta J.},
  title = {Challenges In Implementing Sustainability-Related Risk Management Practices On Public-Private Partnership Road Projects In Zambia},
  journal = {IOSR Journal of Business and Management},
  year = {2026},
  volume = {28},
  number = {2},
  pages = {34--39},
  doi = {10.9790/487x-2802033439}
}
Kostenlos starten →